Teesside Oil Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

Brief Description

  • The plant includes a stabilization section, an NGL section, utilities section, crude oil and NGL storage tanks and a port of shipment.
  • The terminal was built to receive oil from the Ekofisk Oil Field
  • The terminal also receives production from J-Block and other third-party volumes from other areas of the North Sea.

Contractors

Ongoing Projects

  • -

Other Information

  • -

History

  • 1975 - The terminal began operations
  • 1979 - The processing plant was commissioned

Links

  1. Teesside Oil Terminal