Rospo Mare Oil Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Energean
  • Country: Italy
  • Location: Adriatic
  • Production start:
  • Partners:
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The field consists of three platforms (RSMA, RSMB and RSMC) and a floating storage and offloading tanker (Alba Marina FSO) to temporarily store production.
  • RSM B is the main platform where the oil treatment is performed. It is connected to the two satellite platforms with two 16” sealines. RSM B is also connected to the oil tanker ship Alba Marina.
  • The field been producing since 1982 and has been developed with 31 wells (29 producing wells)


Contractors

  • Saipem: Platform transport & Installation
  • Micoperi: Alba Marina FSO Flexible Hose Replacement

History

  • 1982 - First oil produced
  • 1991 - Platforms installed
  • 2019 - Energean acquired a stake in the field from Edison
  • 2024 - Carlyle International Energy Partners agreed to acquire Energean's stake

Geology

Links

  1. Offshore Platforms in Italy
  2. Saipem Europe Fixed Offshore Production Facilities Project R
  3. Micoperi Offshore And Platform References
  4. Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.
  5. Strategic sale of Egypt, Italy and Croatia portfolio