Corrib Gas Field
		
		
		
		
		Jump to navigation
		Jump to search
		
Summary Information
- Operator: Shell
 - Country: Ireland
 - Location: Atlantic Ocean off the western coast of the Republic of Ireland
 - Production start:
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- Corrib will be developed as a subsea production facility with onshore processing
 - Gas will be treated at the Bellanaboy Bridge Gas Terminal
 - The project has been delayed for some years mainly due to lengthy consideration of planning applications both for the terminal and the onshore section of pipeline
 
+++ Contractors
- **Technip:** Project manage and install an umbilical (84km), a 20” spool piece and three flexible flowlines (1.6 / 1.7 / 2.4km) and five wellhead protection structures and a manifold
 
+++ History
- 1996 - Corrib Gas Field discovered
 - 2005 - Technip awarded umbilical and flowlines contract
 - 2009 - Marathon sold its share to Vermilion Energy Trust
 - 2011 - Permission granted for onshore pipeline
 
+++ Geology
+++ Links
- Corrib Gas Project Development
 - Promising well off Ireland
 - Marathon Oil Corporation Announces Sale of Its Interest in Corrib Development in Ireland
 - Technip awarded three contracts for subsea developments in the Norht Sea and offshore Ireland
 - Vermilion Announces An Bord Pleanala's Approval for the Construction of the Corrib Onshore Pipeline
 - DOF Subsea has been awarded contracts in the Atlantic and North America region