Difference between revisions of "Grane Crude Oil Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
(No difference)
|
Latest revision as of 16:59, 7 May 2024
Contents
Summary Information
- Source: Grane Oil Field
- Destination:
- Ownership: Equinor
- Website:
- Length: 220 kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type:
Brief Description
- The pipeline connects the Grane Oil Field to the Sture Oil Terminal
Pipeline Status
- In operation
History
- 2003 - The pipeline was commissioned
Other Information
- -