Q08 Gas Fields
Revision as of 07:36, 16 August 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Wintershall * Country: Netherlands * Location: North Sea * Production start: * Partners: * Type: Gas * Estimated Reserves: * Production Vol...")
Summary Information
- Operator: Wintershall
- Country: Netherlands
- Location: North Sea
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development consists of a wellhead platform (Q8-A), a satellite platform (Q8-B) and a subsea completion (Q5-A1) which is tied back to Q8-B
- Gas is transported to shore by a dedicated pipeline
+++ Contractors
- **Stolt Offshore:** Installation for Q5
+++ History
- 1986 - Q8-A wellhead platform installed
- 1994 - Q8-B - satellite plaform installed
- 2004 - Q5-A1 installed
- 2014 - Tullow sold its stake in Q5
+++ Geology
+++ Links