West Java Refinery Project

From A Barrel Full
Revision as of 06:31, 8 August 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Pertamina from Indonesia (40%), NIORDC from Iran (40%), and Petrofield from Malaysia (20%)) * Website: http://www.pertamina.com/ * List of...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Ownership: Pertamina from Indonesia (40%), NIORDC from Iran (40%), and Petrofield from Malaysia (20%))
  • Website: http://www.pertamina.com/
* List of [[[Pertamina Refineries]]]
* List of [[[NIORDC Refineries]]]
  • Wiki Page: [[[Banten Bay Refinery]]]
  • Location: Banten Bay, West Java, Indonesia
  • Capacity: 7.5 million tons/annum & 150,000 bbl/day
  • Nelson Complexity:
  • Project Stage:
  • Expected Completion:
  • Budget:

+++ The Project

  • Project Type: Greenfield Refinery
  • Project Summary:
  • Main Contractors

+++ Refining Units

  • -

+++ Terminal Capacity

  • Crude Oil:
  • Refined Products:

+++ Crude Supply

  • Iranian and other heavy and sour crudes


+++ Products Produced

  • -


+++ Other Information

  • Preliminary feasibility studies are completed.
  • Refinery locating studies are completed and Banten region in the west of Java is suggested.
  • A new framework agreement is signed with the Indonesian partner.
  • A new SHA is concluded between Iranian, Malaysian and Indonesian share holders.
  • J.V. Company Established , BFS has been completed.


+++ Relevant Links

  1. Project Details from NIORDC