Saturn Area Gas Fields
Revision as of 14:58, 3 June 2024 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Harbour Energy
- Country: UK
- Location: Southern North Sea, blocks 48/10a and 48/10b
- Production start: 2005
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Saturn Unit lies in Blocks 48/10a and 48/10b of the Southern North Sea and consists of natural gas accumulations Atlas, Hyperion and Rhea.
- The development concept includes an unmanned six slot minimum facilities platform
- Mimas and Tethys Gas Fields are tied back to the Saturn Platform
- A 43 km 14-inch pipeline ties back the Saturn platform to Lincolnshire Offshore Gas Gathering System (Loggs)
+++ Contractors
- **SLP Engineering Ltd:** Saturn Platform and Loggs PR Separator Vessel
- **Seaway Heavy Lifting:** T & I - Saturn Platform and Loggs PR Separator Vessel
- **Saipem:** Saturn, pipelines EPIC
- **Global Maritime:** Warranty surveyor for installation of flowlines
+++ History
- 2004 - Development approval granted
- 2005 - First gas produced
- 2019 - Chrysaor acquired Conocophillips's stake in the field
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
+++ Geology
+++ Links
- UK Oil and Gas Fields by Approval Date
- Seaway Heavy Lifting Oil And Gas References
- Global Maritime Pipeline References
- Saipem Europe Pipeline References
- RWE Dea announce Saturn (Atlas, Hyperion, and Rhea) development go-ahead
- ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
- Harbour Energy to be admitted to trading