EnQuest Producer FPSO

From A Barrel Full
Revision as of 16:27, 29 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

Brief Description

  • The vessel is 95.263 DWT, has a capacity of 57.000 bopd and is moored in 76 metres of water
  • It is moored using an Internal Turret
  • The FPSO has an open deck process area which includes oil separation, low-pressure gas compression, produced water and seawater injection, utility systems,

boiler modules and steam turbine enclosures.

  • Storage capacity on the FPSO is 625,000bbl.
  • Stabilised oil is exported via tanker. Produced gas is compressed and used for fuel. Produced water is cleaned and discharged overboard to the sea.


Contractors

  • Bluewater:
  • Jumbo: FPSO mooring, installation and hook-up
  • OGN Group: Finishing and commissioning works

Status

  • Decommissioned

History

  • 2008 - Ithaca contracts Bluewater for supply of FPSO
  • 2012 - EnQuest acquires the vessel from Bluewater and changes name from Uisge Gorm FPSO
  • 2012 - Jumbo awarded FPSO mooring, installation and hook-up contract
  • 2015 - First oil from Alma and Galia
  • 2020 - Vessel decommissioned

=== Other Information

Links

  1. Bluewater FPSO References
  2. Jumbo main installation contractor for EnQuest Producer
  3. Sale of FPSO Uisge Gorm
  4. OGN Group Secures EnQuest Producer FPSO Contract