Rovuma LNG Project

From A Barrel Full
Revision as of 10:42, 22 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Ownership:
  • Website:
  • Location: Mozambique
  • Capacity: 18 million tons/annum
  • Status: Under Construction

Brief Description

  • The 18-mtpa Rovuma Onshore LNG development is a modular, electric-drive design that will dramatically reduce the carbon intensity of the LNG
  • Phase one will be two onshore liquefaction trains, each of which will produce 7.6 million tonnes of LNG per year

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 202X

Suppliers / Customers

History

2011 - ENI announces it is planning an LNG terminal

  • 2024 - ADNOC acquired a 10% stake from Galp

Other Information

  • The project has been seriously delayed by unrest

Links

  1. TechnipFMC, JGC and Fluor Consortium Awarded a Contract for the Rovuma LNG Project in Mozambique
  2. ADNOC to Acquire 10% Equity Stake in Major LNG Development in Mozambique


Summary Information

Ownership: ENI (Galp Energia (10 percent), KOGAS (10 percent) and ENH (10 percent)) Website: http://www.eni.com/ Location: Mozambique Capacity: million tons/annum Status: Planned Brief Description

- Technical Details

Storage capacity: Constructor: Licensor: Ongoing Projects/Project Status

Commissioning is expected in 201X Suppliers / Customers



Other Information

- Relevant Links

  1. Eni announces a giant gas discovery offshore Mozambique
  2. Eni: new giant gas discovery in the offshore Mozambique
  3. Mamba North East 2 prospect adds at least 10 tcf to the potential of Area 4 in Mozambique