JAGAL Gas Pipeline

From A Barrel Full
Revision as of 09:50, 10 May 2024 by Abarrelfull (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Frankfurt am Oder, Germany
  • Destination: Rückersdorf, Germany
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 338 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

  • The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
  • It links the Yamal-Europe pipeline to the German transmission system

History

  • 1995 - Construction of the pipeline began
  • 1999 - The first gas flows through the pipeline

Other Information

  • -

Links

  1. Wingas History, 1999
  2. Gascade, JAGAL