Hibiscus Gas Field
Revision as of 18:33, 20 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BG-Group * Country: Trinidad and Tobago * Location: North Coast Marine Area (NCMA) * Production start: 2002 * Partners:  * Type: Gas * Estimate...")
Summary Information
- Operator: BG-Group
 - Country: Trinidad and Tobago
 - Location: North Coast Marine Area (NCMA)
 - Production start: 2002
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Hibiscus platform is installed in a water depth of 492 ft (150 m)
 - There is a 67 mile (107 km), 24-inch pipeline from the development to the [[[Atlantic LNG Terminal]]]
 - The Poinsettia Gas Field is tied back to the Hibiscus Platform
 
+++ Contractors
- **Heerema Marine Contractors:** Installation
 
+++ History
- 1975 - Hibiscus Gas Field discovered
 - 2000 - The Government of Trinidad & Tobago approved the development
 - 2002 - The Hibiscus field begins production
 
+++ Geology
+++ Links