Long Son Petrochemical Project

From A Barrel Full
Revision as of 11:19, 15 January 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

The Project

  • Description: The Project comprises a world-scale grassroots mixed-feed cracker, downstream polyolefins plants (HDPE, PP and LLDPE), central utilities unit, port, jetty and storage facilities and other associated facilities.
  • Constructor:
    • TechnipFMC / SK Engineering: licensing, engineering, procurement, construction, commissioning and start-up of the cracker
  • Licensors:

Production Units

  • flexible feed cracker - 1.6mtpa

Raw Materials Supply

  • -

Products Produced

  • -


Other Information

  • -

History

  • 2018 - EPC contract awarded for project

Links

  1. TechnipFMC Wins a Large Contract for Vietnam’s Largest Olefins Plant