Poerner Refinery References
- Schwedt Refinery
- Desulphurization plant - hazop findings dk2
 - Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
 - Client: PCK Raffinerie GmbH Schwedt
 - Location: Schwedt, Germany
 - Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
 - Commissioning: 2014
 
 - Buna SOW Leuna Refinery
- alkylation plant
 - Revamp of alkylation plant to increase alkylate yield
 - Client: TOTAL Raffinerie Mitteldeutschland GmbH
 - Location: Leuna, Germany
 - Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
 - Commissioning: 2014
 
 - Schwechat Refinery
- rd4 program
 - EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
 - Client: OMV AG
 - Location: Schwechat / Austria
 - Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
 - Commissioning: 2014
 
 - Schwechat Refinery
- butadiene production unit
 - EPCM-Contractor for capacity extensions to Butadiene production unit
 - Client: OMV AG
 - Location: Schwechat / Austria
 - Scope of work:
- Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance,
 
 - Commissioning: 2014
 
 - Schwedt Refinery
- revamp vacuum plant
 - Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process
 - Client: PCK Raffinerie GmbH Schwedt
 - Location: Schwedt / Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction and installation supervision, Commissioning support
 - Commissioning: 2013
 
 - Hamburg Ölwerke Schindler Refinery
- propane deasphalting plant (pda)
 - The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction.
 - Client: H&R Ölwerke Schindler GmbH
 - Location: Hamburg / Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Commissioning
 - Commissioning: 2011
 
 - Schwechat Refinery
- crude oil distillation plant 4 schwechat
 - EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant
 - Client: OMV
 - Location: Schwechat / Austria
 - Scope of work: Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning,
 - Commissioning: 2010
 
 - Schwedt Refinery
- revamp crude oil distillation plant top1
 - Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site
 - Client: PCK Raffinerie Schwedt
 - Location: Schwedt / Germany
 - Scope of work: Detailed engineering, Construction and installation supervision, Procurement, Expediting
 - Commissioning: 2010
 
 - Schwedt Refinery
 
revamp fcc gas concentration plant
- Revamp of the stripping column with further peripheral equipment to improve the propene recovery process
 - Client: PCK Raffinerie Schwedt
 - Location: Schwedt / Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement and expediting, Construction and installation supervision, Commissioning
 - Commissioning: 2010
 
- Schwechat Refinery
- revamp of hds plant
 - Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL
 - Client: OMV
 - Location: Schwechat / Austria
 - Scope of work: Project management, Detailed engineering, Procurement, Construction supervision, Commissioning
 - Commissioning: 2008
 
 - Puralube Zeitz Refinery
- used oil re- refining plant
 - Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology
 - Client: Puralube Raffinerie GmbH
 - Location: Zeitz, Germany
 
 
Scope of work: Basic engineering Detailed engineering Procurement support Commissioning support
- Commissioning: 2008
 
fcc-overcracking-plant
FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality Client: PCK Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2007 Investment: EUR 29 million (in total) debottlenecking of refinery gas plant
Debottlenecking of refinery gas plant Client: OMV Deutschland GmbH Location: Burghausen, Germany Scope of work: Detailed engineering Procurement Construction supervision Site management Commissioning: 2007 revamp hf alkylation
Revamp of existing HF alkylation Client: PCK Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Basic engineering (UOP Schedule A) Detailed engineering Procurement Construction supervision Commissioning: 2007 ok 95 - transfer line
Transfer line OK 95 (with/without ETBE) Client: TOTAL Raffinerie Mitteldeutschland GmbH Location: Leuna, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2006 revamp of hds-1 plant
Revamp of HDS-1 plant Client: OMV Deutschland GmbH Location: Burghausen, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning 2006 new refinery gas plant
New refinery gas plant Modification of associated existing units Client: BAYERNOIL Raffineriegesellschaft LocationIngolstadt, Germany Scope of work: Detailed engineering Procurement (support) Authority engineering Investment cost estimate Construction supervision (piping) Acceptance tests/Tests Start-up assistance Commissioning: 2005
revamp of coking plant Project: Revamp of coking plant with capacity increase Client: BP Erdöl-Raffinerie-Emsland Location: Lingen, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2004 fcc column
Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one Client: Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Basic engineering Detailed engineering Procurement Construction supervision Acceptance tests/Tests Start-up assistance Commissioning: 2004 revamp of light gasoline isomerization
- Emsland Lingen Refinery
- Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package
 - Location: Lingen, Germany
 - Scope of work: Extended basic engineering, Authority engineering, Investment cost estimate, Procurement support , Detailed engineering
 - Commissioning: 2002
 
 - Schwechat Refinery
- desulphurization unit
 - Desus 2
 - Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph
 - Client: PCK Raffinerie GmbH
 - Location: Schwedt, Germany
 - Scope of work: Basic engineering, Detailed engineering, Procurement, Construction supervision, Start-up assistance
 - Commissioning: 2002