Caesar Oil Pipeline
Revision as of 14:29, 14 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information  * Source: Southern Green Canyon * Destination: SS332 * Ownership: BP * Website:  * Length:  kilometres (115 miles)  * Capacity: 450,000 barrels of oil per...")
Summary Information
- Source: Southern Green Canyon
 - Destination: SS332
 - Ownership: BP
 - Website:
 - Length: kilometres (115 miles)
 - Capacity: 450,000 barrels of oil per day
 - Crude Type:
 
+++ Brief Description
- The Caesar pipeline has a design capacity of 450,000 barrels of oil per day (bopd)
 - It is part of the Mardi Gras Offshore Oil And Gas Pipeline System
 
++++ Related Oil and Gas Fields
+++ Pipeline Status
- In operation
 
+++ History
- 2002 - BHP Billiton acquires a stake in the project
 - 2003 - Open season opened
 - 2005 - Caesar Oil Pipeline entered service
 
+++ Other Information
- -
 
+++ Links