Duart Oil Field
Revision as of 08:59, 24 August 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Talisman * Country: UK * Location: 116 miles northeast of Aberdeen in Block 14/20b * Production start: 2007 * Partners: Bridge Energy - 50% * T...")
Summary Information
- Operator: Talisman
 - Country: UK
 - Location: 116 miles northeast of Aberdeen in Block 14/20b
 - Production start: 2007
 - Partners: Bridge Energy - 50%
 - Type: Oil
 - Estimated Reserves: 1.0 million barrels of 2P producing reserves
 - Production Volume:
 
+++ Description
- The field was developed with a single subsea development well
 - The well is tied back via an eight inch production line and three inch gas lift line to the nearby Talisman operated [[[Tartan Oil Field | Tartan platform]]]. Product from Duart is processed on Tartan and co-mingled with other Tartan area production before being piped to the Flotta oil storage terminal.
 
+++ Contractors
- **KWsubsea:** 8"/3" Piggybacked Line (8km)
 
+++ History
- 1988 - The Duart field was discovered
 - 2006 - Talisman decides to develop the project
 - 2007 - Project development approved by UK Government
 - 2007 - First oil produced
 - 2011 - Bridge energy acquired a 50% stake from Nexen
 
+++ Geology
- A high quality Cretaceous interval oil reservoir contained in a simple high relief tilted fault block structure
 
+++ Links