Curlew Gas and Condensate Field
Revision as of 08:54, 24 August 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: UK * Location: North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: ++...")
Summary Information
- Operator: Shell
- Country: UK
- Location: North Sea
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Curlew field system comprises a floating production storage offloading unit (FPSO), Maersk Curlew FPSO, connected via flexible flowlines and risers to three fields (Curlew B, C, and D)
- Gas is transported through the Fulmar Gas Pipeline for sale in the UK
+++ Contractors
- **A&P Tyne:** Construction of hull
- **AMEC:**
- Construction of Topsides
- FEED for for modifications to Maersk’s Curlew FPSO
- **KWSubsea:** Curlew C Development - Detailed design of 6km 8" production pipeline, 3" gas lift piggyback system, tie-in spoolpiece, control umbilical and pliant wave tether base
- **J P Kenny:** Design and supply of tee assembly for new well
+++ History
- 1996 - Project development approved by UK Government
- 2007 - Project development approved by UK Government for Curlew C
- 2010 - AMEC awarded FEED for for modifications to the FPSO
+++ Geology
+++ Links