Clipper Gas Field
Revision as of 17:02, 22 March 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: UK  * Location: Block 048/19a, Southern North Sea * Production start: 1990 * Partners:  * Type: Gas * Estimated Reserves:  * P...")
Summary Information
- Operator: Shell
 - Country: UK
 - Location: Block 048/19a, Southern North Sea
 - Production start: 1990
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea.
 - The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform.
 - First operational in 1990, the installation produces and processes gas from the wells on wellhead platform and gas is also imported from the satellite platforms, producing from the **Barque** (049/16), **Cutter**, **[[[Carrack Gas Field]]]** **[[[Galleon Gas Field | Galleon]]]** and **Skiff** (048/20a) fields.
 - The Barque field consists of 2 unmanned platforms, PL & PB
 - The Galleon field consists of 2 unmanned platforms, PN & PG
 - Cutter & Carrack have one platform each, Cutter QC and Carrack QA
 - The Skiff field consist of a minimum facilities, Skiff PS, normally unmanned installation (NUI), connected via a pipeline to the Clipper platform which provides processing and export facility for the Skiff fluids of gas, condensate and water
 - Gas is exported through a 24 inch diameter subsea pipeline to the [[[Bacton Gas Plant]]] in Norfolk.
 
+++ Contractors
- **Sembmarine SLP:**
 
* Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning * Carrack QA Platform: EPC contracted project including topside, jacket and piles, offshore hook-up and commissioning
- **Rosetti Marino:** Engineering, procurement, fabrication, testing, onshore commissioning, load-out and sea fastening of the Clipper Accommodation Module with integral Utility Deck and Helideck, the link bridge, the jacket and piles.
 - **Stolt Offshore:** Skiff subsea installation
 - **Saipem:** Pipeline T & I
 - **FoundOcean:**
 
* Barque PL Scour Rectification * Grouting for Skiff
- **Nessco:** Communication systems
 
+++ History
- 1988 - Government approval for Clipper & Barque
 - 1990 - Barque PL Platform installed
 - 1990 - Clipper Gas Field came onstream
 - 1993 - Barque South approved
 - 1994 - First gas from Galleon
 - 1995 - Barque PB Platform installed
 - 2000 - Skiff development approved
 - 2005 - Cutter development approved
 - 2006 - Cutter QC Platform installed
 
+++ Geology
+++ Links
- Shell, EMS, 2011
 - Sembmarine SLP, Carrick
 - UK Oil and Gas Fields by Approval Date
 - List Of Oil Production Platforms In The UK
 - List Of Oil and Gas Production Platforms In The UK
 - FoundOcean Subsea References
 - Rosetti Marino Platform References
 - Nessco Platform References
 - Serimax Pipeline References
 - Saipem Pipeline References
 - Licence P 8 - Licence Having Effect Under The Petroleum Act 1998 The Skiff Field