Sangachal Oil and Gas Processing Terminal
Summary Information
- Ownership: BP
- Website:
- Location:
- Capacity:
- Crude Type:
Brief Description
Contractors
- **KBR:** Two gas processing trains with 900 mmscf/d capacity each and condensate processing facilities with about 105 mbd capacity
- **Aker Solutions:**
* Heater Treater Upgrade
* Engineering and subcontract fabrication of an H2S Scavenging vessel
* 1 Treater Vessel c/w 2 37.5 Kva transformers, two firetubes and 5 desand stations
* Fabrication of one (1) 12' x 60'-0" s/s (145,000 BOPD) multi-phase Separator and four (4) 12" x 50'-0" s/s (32,280 BOPD each) multi-stage Heater Treaters for crude oil dehydration
* Design, procurement and fabrication of electrostatic internals for four (4) 12’-0” Ø x 65’-0” T/T Coalescers
Ongoing Projects
Other Information
History
- 2014 - KBR Awarded Design Contract by BP for Shah Deniz Stage 2
Links
- Aker Solutions Oil And Gas Processing References
- BP, Sangachal Oil Terminal
- KBR Awarded Major Engineering Design Contract by BP for Shah Deniz Stage 2 Project