From A Barrel Full
		Balikpapan Refinery Expansion Project
 
		
		
		
		
		Jump to navigation
		Jump to search
		
Summary Information
- Ownership: Pertamina
 
- Website: http://www.pertamina.com/
 
- Wiki Page: Balikpapan Refinery
 
- Location: Balikpapan, Indonesia
 
- Capacity: million tons/annum & bbl/day
 
- Nelson Complexity:
 
- Project Stage:
 
- Expected Completion: 2020
 
- Budget:
 
The Project
- Project Type: Expansion & Upgrade
 
- Project Summary: Also known as the Refinery Development Master Plan (RDMP), it will increase the Balikpapan refinery’s crude processing capacity as well as enable production of cleaner fuels conforming to Euro 5 standard.
 
Main Contractors
- Axens: Resid FCC unit with a design capacity of 90,000 BPSD, a LPG sulfur removal unit (SulfrexTM), a Propylene Recovery Unit (PRU) as well a new 80,000 BPSD middle distillate hydrotreater (Prime-DTM). The gasoline produced by the Resid FCC unit will be selectively hydrodesulfurized in a Prime-G+TM unit with a design capacity of 48,000 BPSD to produce ultra-clean gasoline.
 
- UOP: licensing and engineering for a CCR Platforming™ unit with a capacity of 33,000 barrels per day to produce cleaner-burning high-octane motor fuels and a Unionfining™ hydrotreating unit with a capacity of 47,000 barrels per day to produce kerosene jet fuel. Expand capacity of its existing Unicracking™ units at Balikpapan to 60,000
 
- Air Liquide: Licence and basic engineering for a hydrogen production unit
 
Refining Units
- CCR Platformer - 33,000 bpd
 
- Jet hydrotreating unit - 47,000 bpd
 
- Resid FCC unit - 90,000 bpd
 
- Middle distillate hydrotreater - 80,000 bpd
 
- Hydrogen production unit
 
Terminal Capacity
- Crude Oil:
 
- Refined Products:
 
Crude Supply
Products Produced
- EURO V standard gasoline and diesel
 
History
- 2017 - UOP awarded design contracts
 
- 2018 - Air Liquide awarded hydrogen unit contract
 
Other Information
Relevant Links