VNIPIneft Refinery Project References

From A Barrel Full
Revision as of 22:27, 21 March 2020 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search
  • Taneco Nizhnekamsk Refinery
    • OAO TatneftHydrocrackingComplex, 2.9 MTA – 2014
    • Scope of Work: Authority Engineering,Detailed Design, Procurement, Supervision.
  • Ryazan Refinery
    • ZAO RNPK VGO Hydrocracking Complex,2 MTA – 2014
    • Scope of Work: Authority Engineering
  • Volgograd Refinery
    • OOO LUKOIL-Volgogradneftepererabotka Integrated CDU/VDU, 6 MTA - 2014
    • Scope of Work: Authority Engineering and Detailed Design
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery Isomerization Unit, 650 kTA – 2013
    • OAOVNIPIneftScopeofWork: Basic Design Acceptance, Detailed Design,Supervision
  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery Diesel Hydrotreating Unit, 320 kTA- 2013
    • Scope of Work: Authority Engineering and Detailed Design, Supervision

OOO LUKOIL-Volgogradneftepererabotka Atmospheric – Vacuum Distillation Unit - 2012 OAOVNIPIneftScopeofWork: Authority Engineering OAO Angarskneftekhimproyekt Diesel Hydrotreating Unit- 2012 OAOVNIPIneftScopeofWork: Authority Engineering

  • Moscow Refinery
    • OAO Gazprom Neft – Moscow Refinery PSA Unit - 2011
    • Scope of Work: Authority Engineering and Detailed Design, Supervision

OJSC TANECO CDU/VDU, 7 MTA - 2010 OAOVNIPIneftScopeofWork: Basic Design, Authority Engineering and Detailed Design, Procurement, Supervision OOO PO Kirishinefteorgsintez Capacity: 4.9 MTA (vacuum distillation), 2.2 MTA (visbreaking) OAOVNIPIneftScopeofWork: Basic Design Acceptance; Detailed Design, Procurement. Commissioningdate: 2009 ZAO RNPK Deep Conversion Complex Capacity: 2.5 MTA OAOVNIPIneftScopeofWork: BasicDesignAcceptance, AuthorityEngineeringandDetailedDesign(jointlywithCB&ILummus); Procurement; Supervision. Commissioningdate: 2005-2006 OAO TAIF-NK Catalytic Cracking Complex Capacity: 850 kTA OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; BasicDesign(jointly with OAO VNIINP);DetailedDesign; Procurement; Supervision. Commissioningdate: 2005

  • Yanos Yaroslavl Refinery
    • OAO Slavneft-Yaroslavnefteorgsintez Deep Conversion Complex
    • Capacity: 2.1 MTA
    • Scope of Work: Basic Design Acceptance, Detailed Design(jointly with Toyo Engineering Corporation); Supervision.
    • Commissioning date: 2005

OOO LUKOIL-Permnefteorgsintez VGO Hydrocracking Complex Capacity: 3.5 MTA - Plant OAOVNIPIneftScopeofWork: ActingasaGeneralDesigner; Basic Design Acceptance; DetailedDesign, Procurement, Supervision. Commissioning date: 2004 ZAO RNPK Catalytic Cracking Complex Capacity: 2.5 MTA OAOVNIPIneftScopeofWork: DetailedDesign, Supervision. Commissioning date: 2001

  1. [1]