Ethylen-Pipeline Süd (EPS)
Revision as of 10:40, 13 March 2025 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: Münchsmünster, Bavaria * Destination: Ludwigshafen, Rhineland-Palatinate * Ownership: * Website: https://www.eps-pipeline.de/ * Lengt...")
Contents
Summary Information
- Source: Münchsmünster, Bavaria
- Destination: Ludwigshafen, Rhineland-Palatinate
- Ownership:
- Website: https://www.eps-pipeline.de/
- Length: 370 kilometres ( miles)
- Capacity: barrels of oil per day
- Product Type: Ethylene
Brief Description
- The underground pipeline runs from Münchsmünster for around 103 kilometres through Bavaria, 197 kilometres long in Baden-Württemberg, before the pipeline arrives in Ludwigshafen after another 70 kilometres through Rhineland-Palatinate.
- In Münchsmünster, it is connected to a pipeline to Burghausen while at BASF in Ludwigshafen, the pipeline has been connected to the downstream pipelines of the northwestern German ethylene network.
Pipeline Status
- In operation
History
- 2013 - The pipeline began operations
Other Information
- -
Links
- [ ]