Vampire, Viscount and Valkyrie Gas Fields
Revision as of 12:14, 29 June 2024 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Harbour Energy
 - Country: UK
 - Location: 049/16
 - Production start:
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
 - The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
 - Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
 - Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant
 
+++ Contractors
- **Odebrecht:** T&I for Vampire platform
 
+++ History
- 1998 - Vampire development approval granted
 - 2002 - Development approval for Viscount
 - 2004 - Valkyrie granted development approval
 - 2019 - Chrysaor acquired Conocophillips's stake in the field
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
 
+++ Geology
+++ Links