Vampire, Viscount and Valkyrie Gas Fields
Revision as of 16:27, 3 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Conoco Phillips * Country: UK * Location: 049/16 * Production start:  * Partners:  * Type: Gas * Estimated Reserves:  * Production Volume:   ++...")
Summary Information
- Operator: Conoco Phillips
 - Country: UK
 - Location: 049/16
 - Production start:
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
 - The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
 - Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
 - Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant
 
+++ Contractors
- **Odebrecht:** T&I for Vampire platform
 
+++ History
- 1998 - Vampire development approval granted
 - 2002 - Development approval for Viscount
 - 2004 - Valkyrie granted development approval
 
+++ Geology
+++ Links