Saturn Area Gas Fields
Revision as of 14:59, 3 June 2024 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Harbour Energy
 - Country: UK
 - Location: Southern North Sea, blocks 48/10a and 48/10b
 - Production start: 2005
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The Saturn Unit lies in Blocks 48/10a and 48/10b of the Southern North Sea and consists of natural gas accumulations Atlas, Hyperion and Rhea.
 - The development concept includes an unmanned six slot minimum facilities platform
 - Mimas and Tethys Gas Fields are tied back to the Saturn Platform
 - A 43 km 14-inch pipeline ties back the Saturn platform to Lincolnshire Offshore Gas Gathering System (Loggs)
 
Contractors
- SLP Engineering Ltd: Saturn Platform and Loggs PR Separator Vessel
 - Seaway Heavy Lifting: T & I - Saturn Platform and Loggs PR Separator Vessel
 - Saipem: Saturn, pipelines EPIC
 - Global Maritime: Warranty surveyor for installation of flowlines
 
History
- 2004 - Development approval granted
 - 2005 - First gas produced
 - 2019 - Chrysaor acquired Conocophillips's stake in the field
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
 
Geology
Links
- UK Oil and Gas Fields by Approval Date
 - Seaway Heavy Lifting Oil And Gas References
 - Global Maritime Pipeline References
 - Saipem Europe Pipeline References
 - RWE Dea announce Saturn (Atlas, Hyperion, and Rhea) development go-ahead
 - ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
 - Harbour Energy to be admitted to trading