Pagerungan Gas Field
Revision as of 08:33, 26 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator:  * Country:  * Location: Kangean block * Production start:  * Partners:  * Type: Gas * Estimated Reserves:  * Production Volume:   +++ Descript...")
Summary Information
- Operator:
- Country:
- Location: Kangean block
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The field utilises Brotojoyo FPSO
+++ Contractors
- **Tripatra:**
* Preliminary Engineering for Platform * FEED for gas processing
+++ History
- 1994 - Gas production started
- 2006 - Production temporarily halted due to pipeline rupture
+++ Geology
+++ Links
