Laila Gas Field
Revision as of 07:05, 26 October 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: SK 307
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
+++ Contractors
- **Technip:** Pipelines
- Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters,
- Diver installation of riser clamps at both jacket platforms,
- Pre-commissioning of the flowlines,
- Project management.
+++ History
+++ Geology
+++ Links