Whale Oil and Gas Field

From A Barrel Full
Revision as of 14:56, 27 November 2023 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Shell * Country: USA * Location: Alaminos Canyon * Production start: Expected 2024 * Partners: Chevron * Type: Oil & Gas * Estimated Re...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Shell
  • Country: USA
  • Location: Alaminos Canyon
  • Production start: Expected 2024
  • Partners: Chevron
  • Type: Oil & Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Whale production facility is in the Alaminos Canyon Block 773 and is adjacent to the Shell-operated Silvertip field, approximately 10 miles from the Shell-operated Perdido platform and approximately 200 miles southwest of Houston.
  • The development will use a four-column semi-submersible host facility, which is a clone of that in the Vito Oil Field
  • Gas will be exported via a 25-mile gas lateral pipeline build from the Whale platform to the existing Perdido gas pipeline and a new 125-mile oil pipeline to the existing Williams-owned GA-A244 junction platform. The natural gas will be transported to Williams’ Markham gas processing plant located in Matagorda, TX.

Contractors

  • -

History

Geology

Links