Gimboa Oil Field
Revision as of 10:28, 20 October 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Sonangol  * Country: Angola * Location: 85 km offshore the Angolan cost, in the block 4 * Production start: 2009 * Partners: * Type: Oil / Gas...")
Summary Information
- Operator: Sonangol
 - Country: Angola
 - Location: 85 km offshore the Angolan cost, in the block 4
 - Production start: 2009
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Gimboa project consists of three production and four water injection subsea wells, clustered around a central manifold and tied-back to a floating production storage and offloading unit, the [[[Gimboa FPSO]]]
 
+++ Contractors
- **Saipem:** Contract for the provision and management of a FPSO (Floating Production Storage and Offloading) vessel
 - **Aker Kvaerner:** Project management, engineering, manufacturing, testing, delivery and installation support for the Gimboa subsea production system
 - **Technip:** engineering, procurement, fabrication, testing, installation and pre-commissioning of:
 
* one production and one water injection flexible flowlines * one gas lift flexible pipe, * one service umbilical, * associated flexible risers system, and * flexible well jumpers
+++ History
- 2004 - Gimboa Oil Field discovered
 - 2006 - Sonangol signed a contract with Aker Kvaerner for supply of the subsea production system
 - 2006 - Saipem awarded FPSO contract
 - 2007 - Additional reserves discovered
 - 2009 - First production
 
+++ Geology
+++ Links