Fuka St Fergus Gas Processing Terminal
Revision as of 15:55, 30 May 2024 by Abarrelfull (talk | contribs)
Contents
Summary Information
- Ownership: Total
- Website: http://www.total.com/en
- Location: St Fergus, Scotland
- Capacity:
Brief Description
- It is a 3-train process plant that is now known as the Frigg UK Terminal.
- Gas is transported to the plant by the **Frigg UK Gas Pipeline System** and from the Vesterled Gas Pipeline which brings gas from the Norwegian sector
- The Shetland Island Regional Gas Export Pipeline System (SIRGE) will permit the tie-in of West of Shetland gas into FUKA.
- The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.
Related Oil and Gas Fields
- It processes gas from the Alwyn Area (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), Bruce, Rhum, Keith, Buzzard, the Flotta Catchment Area (including Piper Oil Field), Ross and Captain.
Ongoing Projects
- -
Other Information
- -
History
- 1977 - Phase I of the plant was commissioned
- 1978 - Phase II was completed
- 2015 - NSMP acquired the terminal from Total