Barbara Gas Field
Revision as of 07:27, 4 January 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: ENI
 - Country: Italy
 - Location: Adriatic
 - Production start:
 - Partners:
 - Type: Oil / Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- There are 9 production platforms, A, B, C, D, E, F, G, H & NW
 - A total of 69 wells are in production
 
+++ Contractors
- **Saipem:**
- Barbara D Topsides fabrication and installation
 - Engineering Services for Barbara F - eight legged jacket - unmanned DP platform
 
 - **Tecon:** Barbara NW - Basic and detail structural design of jacket and deck
 
+++ History
- 1987 - Barbara D platform installed
 - 2997 - Barbara NW project started
 
+++ Geology
+++ Links