Difference between revisions of "Espirito Santo BC-10 FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Name: Espirito Santo Bc 10 FPSO | * Name: Espirito Santo Bc 10 FPSO | ||
Line 10: | Line 10: | ||
* Year of Completion: 2008 | * Year of Completion: 2008 | ||
− | + | === Brief Description === | |
* FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels. | * FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels. | ||
* It is the conversion of a crude tanker | * It is the conversion of a crude tanker | ||
− | + | === Contractors === | |
− | * | + | * '''SBM Offshore:''' Lease and operation of the FPSO |
− | * | + | * '''Keppel:''' Conversion, including refurbishment and conversion of the vessel’s existing systems, upgrading of the accommodation facilities, fabrication and installation of sponson tanks (making the entire hull double sided), the turret mooring system, pipe rack, flare tower and helideck as well as integration of all of the oil processing modules |
− | * | + | * '''Kavin Engineering:''' Gas Dehydration and TEG Regeneration Package |
− | * | + | * '''Nexans:''' Manufacture and supply the specialized offshore power, control and instrumentation cables |
− | * | + | * '''Dyna-Mac:''' Seven units of topside modules |
− | * | + | * '''VWS Westgarth:''' Water Treatment |
− | + | === Status === | |
* In operation | * In operation | ||
− | + | === History === | |
* 2006 - SBM Offshore awarded FPSO contract | * 2006 - SBM Offshore awarded FPSO contract | ||
* 2008 - Espirito Santo FPSO arrives in Brazil | * 2008 - Espirito Santo FPSO arrives in Brazil | ||
* 2009 - Phase 1 oil production starts | * 2009 - Phase 1 oil production starts | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [[Dyna-Mac Topsides Module Business]] | # [[Dyna-Mac Topsides Module Business]] | ||
Line 47: | Line 47: | ||
# [http://killajoules.wikidot.com/archive:new-orders-for-sbm-offshore-including-a-lease-contra/ New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil] | # [http://killajoules.wikidot.com/archive:new-orders-for-sbm-offshore-including-a-lease-contra/ New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil] | ||
# [http://killajoules.wikidot.com/archive:shell-begins-production-at-parque-das-conchas-bc-10/ Shell begins production at Parque das Conchas (BC-10) offshore Brazil] | # [http://killajoules.wikidot.com/archive:shell-begins-production-at-parque-das-conchas-bc-10/ Shell begins production at Parque das Conchas (BC-10) offshore Brazil] | ||
+ | |||
+ | [[Category:FSPO]] | ||
+ | [[Category:Brazil]] | ||
+ | [[Category:SBM Offshore]] |
Revision as of 16:22, 30 March 2025
Contents
Summary Information
- Name: Espirito Santo Bc 10 FPSO
- Field: Parque das Conchas Oil Field
- Country: Brazil
- Ownership: SBM Offshore
- Website: http://www.sbmoffshore.com/
- Operated By: Shell
- Capacity: 100,000 bpd
- Year of Completion: 2008
Brief Description
- FPSO Espirito Santo has a daily processing capacity of 100,000 barrels of oil and 1.42 million cubic meters of gas, and storage of up to 1.4 million barrels.
- It is the conversion of a crude tanker
Contractors
- SBM Offshore: Lease and operation of the FPSO
- Keppel: Conversion, including refurbishment and conversion of the vessel’s existing systems, upgrading of the accommodation facilities, fabrication and installation of sponson tanks (making the entire hull double sided), the turret mooring system, pipe rack, flare tower and helideck as well as integration of all of the oil processing modules
- Kavin Engineering: Gas Dehydration and TEG Regeneration Package
- Nexans: Manufacture and supply the specialized offshore power, control and instrumentation cables
- Dyna-Mac: Seven units of topside modules
- VWS Westgarth: Water Treatment
Status
- In operation
History
- 2006 - SBM Offshore awarded FPSO contract
- 2008 - Espirito Santo FPSO arrives in Brazil
- 2009 - Phase 1 oil production starts
Other Information
- -
Links
- Dyna-Mac Topsides Module Business
- International Protective Coatings FPSO References
- Kavin Engineering FPSO References
- Misc FPSOs And Platforms
- VWS Westgarth FPSO References
- Nexans completes an offshore cable contract for the conversion of ESPIRITO SANTO FPSO
- Keppel Shipyard scores another safety record with its ninth FPSO delivery for SBM
- Parque das Conchas FPSO arrives in Brazil
- New Orders For SBM Offshore Including A Lease Contract With Shell For The BC-10 FPSO, Brazil
- Shell begins production at Parque das Conchas (BC-10) offshore Brazil