Difference between revisions of "Vampire, Viscount and Valkyrie Gas Fields"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information * Operator: Conoco Phillips * Country: UK * Location: 049/16 * Production start:  * Partners:  * Type: Gas * Estimated Reserves:  * Production Volume:   ++...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
| − | * Operator:   | + | * Operator: Harbour Energy  | 
* Country: UK  | * Country: UK  | ||
* Location: 049/16  | * Location: 049/16  | ||
| Line 22: | Line 22: | ||
* 2002 - Development approval for Viscount  | * 2002 - Development approval for Viscount  | ||
* 2004 - Valkyrie granted development approval  | * 2004 - Valkyrie granted development approval  | ||
| + | * 2019 - Chrysaor acquired Conocophillips's stake in the field  | ||
| + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy  | ||
+++ Geology  | +++ Geology  | ||
| Line 30: | Line 32: | ||
# [[UK Oil and Gas Fields by Approval Date]]  | # [[UK Oil and Gas Fields by Approval Date]]  | ||
# [[Seaway Heavy Lifting Europe Oil And Gas References]]  | # [[Seaway Heavy Lifting Europe Oil And Gas References]]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading]  | ||
| + | |||
| + | [[category:Field]]  | ||
| + | [[category:UK]]  | ||
| + | [[category:Harbour Energy]]  | ||
Revision as of 12:14, 29 June 2024
Summary Information
- Operator: Harbour Energy
 - Country: UK
 - Location: 049/16
 - Production start:
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
+++ Description
- The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
 - The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
 - Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
 - Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant
 
+++ Contractors
- **Odebrecht:** T&I for Vampire platform
 
+++ History
- 1998 - Vampire development approval granted
 - 2002 - Development approval for Viscount
 - 2004 - Valkyrie granted development approval
 - 2019 - Chrysaor acquired Conocophillips's stake in the field
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
 
+++ Geology
+++ Links