Difference between revisions of "Stybarrow Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: BHP Billiton * Country: Australia * Location: Southern Carnarvon Basin * Production start: * Partners: BHP Billiton - 50%, Woodside - 50% * Ty...")
 
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: BHP Billiton
 
* Operator: BHP Billiton
 
* Country: Australia
 
* Country: Australia
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The [[Stybarrow Venture MV16 FPSO]] has a storage capacity of 900,000 barrels, a total liquid processing capacity of 100,000 barrels per day, a crude production capacity of 80,000 barrels of oil per day and a gas production capacity of 45 million standard cubic feet per day.  
 
* The [[Stybarrow Venture MV16 FPSO]] has a storage capacity of 900,000 barrels, a total liquid processing capacity of 100,000 barrels per day, a crude production capacity of 80,000 barrels of oil per day and a gas production capacity of 45 million standard cubic feet per day.  
 
* There are 9 subsea wells supplying the FPSO
 
* There are 9 subsea wells supplying the FPSO
 
* It is installed in approximately 825 meters water depth.
 
* It is installed in approximately 825 meters water depth.
  
+++ Contractors
+
=== Contractors ===
 
* **MODEC:** Provision of a Floating Production, Storage and Offloading (FPSO) facility
 
* **MODEC:** Provision of a Floating Production, Storage and Offloading (FPSO) facility
 
* **Technip-Subsea 7:**  
 
* **Technip-Subsea 7:**  
Line 20: Line 20:
 
** Also transport, installation and pre-commissioning of approximately 16 kms of dynamic and static umbilicals and associated electrical and hydraulic flying leads as well as the installation of the FPSO* spider buoy and mooring system complete with anchors
 
** Also transport, installation and pre-commissioning of approximately 16 kms of dynamic and static umbilicals and associated electrical and hydraulic flying leads as well as the installation of the FPSO* spider buoy and mooring system complete with anchors
  
+++ History
+
=== History ===
 
* 2003 - Stybarrow Oil Field discovered
 
* 2003 - Stybarrow Oil Field discovered
 
* 2006 - MODEC Awarded FPSO contract
 
* 2006 - MODEC Awarded FPSO contract
Line 26: Line 26:
 
* 2007 - First oil from Stybarrow Oil Field
 
* 2007 - First oil from Stybarrow Oil Field
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [http://killajoules.wikidot.com/archive:modec-awarded-fpso-for-stybarrow-field-offshore-aust MODEC Awarded FPSO for Stybarrow Field, Offshore Australia]
 
# [http://killajoules.wikidot.com/archive:modec-awarded-fpso-for-stybarrow-field-offshore-aust MODEC Awarded FPSO for Stybarrow Field, Offshore Australia]
 
# [http://killajoules.wikidot.com/archive:fpso-stybarrow-venture-mv16-naming-ceremony/ FPSO Stybarrow Venture MV16 Naming Ceremony]
 
# [http://killajoules.wikidot.com/archive:fpso-stybarrow-venture-mv16-naming-ceremony/ FPSO Stybarrow Venture MV16 Naming Ceremony]

Latest revision as of 14:12, 24 June 2024

Summary Information

  • Operator: BHP Billiton
  • Country: Australia
  • Location: Southern Carnarvon Basin
  • Production start:
  • Partners: BHP Billiton - 50%, Woodside - 50%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Stybarrow Venture MV16 FPSO has a storage capacity of 900,000 barrels, a total liquid processing capacity of 100,000 barrels per day, a crude production capacity of 80,000 barrels of oil per day and a gas production capacity of 45 million standard cubic feet per day.
  • There are 9 subsea wells supplying the FPSO
  • It is installed in approximately 825 meters water depth.

Contractors

  • **MODEC:** Provision of a Floating Production, Storage and Offloading (FPSO) facility
  • **Technip-Subsea 7:**
    • Design, manufacture, transport, installation and pre-commissioning of approximately 48 kms of flexible risers, flowlines and jumpers
    • Also transport, installation and pre-commissioning of approximately 16 kms of dynamic and static umbilicals and associated electrical and hydraulic flying leads as well as the installation of the FPSO* spider buoy and mooring system complete with anchors

History

  • 2003 - Stybarrow Oil Field discovered
  • 2006 - MODEC Awarded FPSO contract
  • 2006 - Technip-Subsea 7 awarded subsea installation contract
  • 2007 - First oil from Stybarrow Oil Field

Geology

Links

  1. MODEC Awarded FPSO for Stybarrow Field, Offshore Australia
  2. FPSO Stybarrow Venture MV16 Naming Ceremony
  3. MODEC's FPSO Stybarrow Venture MV16 Achieves First Oil
  4. BHP Billiton Successfully Completes WA-255-P(2) Drilling Campaign Off Western Australia
  5. BHP Billiton Announces Oil Discovery within WA-255-P in Exmouth Sub Basin Off Western Australia
  6. Technip-Subsea 7 awarded subsea installation contract for the Stybarrow project in Australia