Difference between revisions of "Viking Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
| − | * Operator:   | + | * Operator: Harbour Energy  | 
* Country: UK  | * Country: UK  | ||
* Location: Southern North Sea  | * Location: Southern North Sea  | ||
| Line 9: | Line 9: | ||
* Production Volume:    | * Production Volume:    | ||
| − | + | === Description ===  | |
| + | * The field is no longer producing  | ||
* Viking is situated in Blocks 49/12, 49/16 and 49/17.    | * Viking is situated in Blocks 49/12, 49/16 and 49/17.    | ||
* Viking consists of seven normally unmanned platforms in the Southern North Sea plus one manned main complex, Viking B, and the associated outlying **Vixen** subsea satellite.  | * Viking consists of seven normally unmanned platforms in the Southern North Sea plus one manned main complex, Viking B, and the associated outlying **Vixen** subsea satellite.  | ||
| Line 17: | Line 18: | ||
* Gas is exported to the [[Theddlethorpe Gas Processing Plant]]  | * Gas is exported to the [[Theddlethorpe Gas Processing Plant]]  | ||
| − | + | === Contractors ===  | |
| − | *   | + | * '''Seaway Heavy Lifting:'''   | 
** Construction of Viking BD Platform Module  | ** Construction of Viking BD Platform Module  | ||
** T & I of Viking ED Platform Module  | ** T & I of Viking ED Platform Module  | ||
| − | *   | + | * '''Saipem:''' Viking Pipeline (EPIC)  | 
| − | *   | + | * '''KWSubsea:''' Detailed design of a 16" 27km gas export pipeline and 3" methanol piggyback system  | 
* ETPM: Subsea installation for Phoenix project  | * ETPM: Subsea installation for Phoenix project  | ||
| − | *   | + | * '''FoundOcean:''' Grouting for Phoenix project & BA Platform  | 
| − | *   | + | * '''J P Kenny:''' Detailed design of the **Vixen** piled Wellhead Protection Structure (WHPS)  | 
| − | *   | + | * '''Global Maritime:'''   | 
** Warranty surveyor for installation of flowline - Viking - Replacement Project  | ** Warranty surveyor for installation of flowline - Viking - Replacement Project  | ||
** Warranty surveyor for installation of 12” piggybacked infield pipeline  | ** Warranty surveyor for installation of 12” piggybacked infield pipeline  | ||
| − | + | === History ===  | |
* 1968 - Viking Gas Field discovered  | * 1968 - Viking Gas Field discovered  | ||
* 1972 - Field development plan approved  | * 1972 - Field development plan approved  | ||
| Line 36: | Line 37: | ||
* 1999 - Permission granted for Vixen development  | * 1999 - Permission granted for Vixen development  | ||
* 2014 - Decommissioning started  | * 2014 - Decommissioning started  | ||
| + | * 2019 - Chrysaor acquired Conocophillips's stake in the field  | ||
| + | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy  | ||
| + | * 2022 - Approval granted for decommissioning  | ||
| − | + | === Geology ===  | |
*    | *    | ||
| − | + | === Links ===  | |
# [http://www.conocophillips.com/investor-relations/fact-sheet-financial-data/Documents/SMID_392_FactSheet-Europe.pdf Conocophillips, Fact Sheet Europe]  | # [http://www.conocophillips.com/investor-relations/fact-sheet-financial-data/Documents/SMID_392_FactSheet-Europe.pdf Conocophillips, Fact Sheet Europe]  | ||
# [[UK Oil and Gas Fields by Approval Date]]  | # [[UK Oil and Gas Fields by Approval Date]]  | ||
| + | # [[UK Oil and Gas Field Approved Decommissioning Programmes]]  | ||
# [[Seaway Heavy Lifting Oil And Gas References]]  | # [[Seaway Heavy Lifting Oil And Gas References]]  | ||
# [[Saipem Europe Pipeline References]]  | # [[Saipem Europe Pipeline References]]  | ||
| Line 52: | Line 57: | ||
# [[Serimax Pipeline References]]  | # [[Serimax Pipeline References]]  | ||
# [http://killajoules.wikidot.com/archive:offshore-petroleum-production-and-pipe-lines-assessm Offshore Petroleum Production And Pipe-Lines (Assessment Of Environmental Effects) Regulations 1999 Licence P 33 - Licence Having Effect Under The Petroleum Act 1998, The Vixen Field]  | # [http://killajoules.wikidot.com/archive:offshore-petroleum-production-and-pipe-lines-assessm Offshore Petroleum Production And Pipe-Lines (Assessment Of Environmental Effects) Regulations 1999 Licence P 33 - Licence Having Effect Under The Petroleum Act 1998, The Vixen Field]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries]  | ||
| + | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading]  | ||
| + | |||
| + | [[category:Field]]  | ||
| + | [[category:UK]]  | ||
| + | [[category:Harbour Energy]]  | ||
Revision as of 15:16, 3 June 2024
Summary Information
- Operator: Harbour Energy
 - Country: UK
 - Location: Southern North Sea
 - Production start: 1972
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The field is no longer producing
 - Viking is situated in Blocks 49/12, 49/16 and 49/17.
 - Viking consists of seven normally unmanned platforms in the Southern North Sea plus one manned main complex, Viking B, and the associated outlying **Vixen** subsea satellite.
 - Vixen was developed by a subsea installation tied back to the Viking platform via an infield pipeline.
 - The 1998 Phoenix project added the KD & LD platforms and four more wells
 - The Victor Gas Field is also tied back to the Viking Platform
 - Gas is exported to the Theddlethorpe Gas Processing Plant
 
Contractors
- Seaway Heavy Lifting:
- Construction of Viking BD Platform Module
 - T & I of Viking ED Platform Module
 
 - Saipem: Viking Pipeline (EPIC)
 - KWSubsea: Detailed design of a 16" 27km gas export pipeline and 3" methanol piggyback system
 - ETPM: Subsea installation for Phoenix project
 - FoundOcean: Grouting for Phoenix project & BA Platform
 - J P Kenny: Detailed design of the **Vixen** piled Wellhead Protection Structure (WHPS)
 - Global Maritime:
- Warranty surveyor for installation of flowline - Viking - Replacement Project
 - Warranty surveyor for installation of 12” piggybacked infield pipeline
 
 
History
- 1968 - Viking Gas Field discovered
 - 1972 - Field development plan approved
 - 1972 - First gas produced
 - 1999 - Permission granted for Vixen development
 - 2014 - Decommissioning started
 - 2019 - Chrysaor acquired Conocophillips's stake in the field
 - 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
 - 2022 - Approval granted for decommissioning
 
Geology
Links
- Conocophillips, Fact Sheet Europe
 - UK Oil and Gas Fields by Approval Date
 - UK Oil and Gas Field Approved Decommissioning Programmes
 - Seaway Heavy Lifting Oil And Gas References
 - Saipem Europe Pipeline References
 - International Protective Coatings Platform References
 - FoundOcean Subsea References
 - KWSubsea Subsea References
 - J P Kenny Subsea References
 - Global Maritime Pipeline References
 - Serimax Pipeline References
 - Offshore Petroleum Production And Pipe-Lines (Assessment Of Environmental Effects) Regulations 1999 Licence P 33 - Licence Having Effect Under The Petroleum Act 1998, The Vixen Field
 - ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
 - Harbour Energy to be admitted to trading