Difference between revisions of "Whistler Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
Line 14: Line 14:
 
=== History ===
 
=== History ===
 
* 2022 - FID for expansion project
 
* 2022 - FID for expansion project
 +
* 2024 - Enbridge became a partner in the pipeline
  
 
=== Other Information ===
 
=== Other Information ===
Line 20: Line 21:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2023/09/whistler-pipeline-expansion-reaches.html Whistler Pipeline expansion reaches final investment decision]
 
# [https://abarrelfull.blogspot.com/2023/09/whistler-pipeline-expansion-reaches.html Whistler Pipeline expansion reaches final investment decision]
 +
# [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:USA]]
 
[[category:USA]]
 
[[category:MPLX]]
 
[[category:MPLX]]

Revision as of 09:54, 13 May 2024

Summary Information

  • Source: Waha
  • Destination: Agua Dulce
  • Ownership: MPLX LP & WhiteWater Midstream
  • Website:
  • Length: kilometres (450 miles)
  • Capacity: 2 BCF per day
  • Status: Operating

Details

  • The Whistler pipeline is an approximately 450-mile, 42-inch diameter intrastate pipeline that transports natural gas from the Waha Header in the Permian Basin to Agua Dulce Natural Gas Hub, Texas, providing direct access to South Texas and export markets. An approximately 85-mile, 36-inch diameter lateral provides connectivity to the Midland Basin.

History

  • 2022 - FID for expansion project
  • 2024 - Enbridge became a partner in the pipeline

Other Information

  • -

Links

  1. Whistler Pipeline expansion reaches final investment decision
  2. Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand