Difference between revisions of "JAGAL Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Source: Frankfurt am Oder, Germany | * Source: Frankfurt am Oder, Germany | ||
* Destination: Rückersdorf, Germany | * Destination: Rückersdorf, Germany | ||
− | * Ownership: | + | * Ownership: Gascade |
− | * Website: | + | * Website: https://www.gascade.de/ |
− | * Length: | + | * Length: 338 kilometres ( miles) |
* Capacity: per day | * Capacity: per day | ||
* Status: Operating | * Status: Operating | ||
+++ Details | +++ Details | ||
− | * The pipeline | + | * The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with [[STEGAL Gas Pipeline]] |
− | * It links the | + | * It links the [[Yamal Europe Pipeline]] to the German transmission system |
+++ History | +++ History | ||
Line 22: | Line 22: | ||
+++ Links | +++ Links | ||
# [http://www.wingas.com/chronik_1999.html?&L=1 Wingas History, 1999] | # [http://www.wingas.com/chronik_1999.html?&L=1 Wingas History, 1999] | ||
+ | # [https://www.gascade.de/en/our-network/our-pipelines/jagal Gascade, JAGAL] |
Revision as of 20:54, 9 May 2024
Summary Information
- Source: Frankfurt am Oder, Germany
- Destination: Rückersdorf, Germany
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 338 kilometres ( miles)
- Capacity: per day
- Status: Operating
+++ Details
- The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
- It links the Yamal Europe Pipeline to the German transmission system
+++ History
- 1995 - Construction of the pipeline began
- 1999 - The first gas flows through the pipeline
+++ Other Information
- -
+++ Links