Difference between revisions of "Fuka St Fergus Gas Processing Terminal"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  (Created page with "Summary Information  * Ownership: Total * Website: http://www.total.com/en * Location: St Fergus, Scotland * Capacity:   +++ Brief Description * It is a 3-train process plant...")  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 13: | Line 13: | ||
++++ Related Oil and Gas Fields  | ++++ Related Oil and Gas Fields  | ||
| − | * It processes gas from the [[Greater Alwyn Oil   | + | * It processes gas from the [[Greater Alwyn Oil and Gas Fields | Alwyn Area]] (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), [[Bruce Oil and Gas Field | Bruce]], [[Rhum Gas Field | Rhum]], Keith, [[Buzzard Oil Field | Buzzard]], the Flotta Catchment Area, [[Ross and Blake Oil Fields | Ross]] and [[Captain Oil Field | Captain]].  | 
+++ Ongoing Projects  | +++ Ongoing Projects  | ||
Revision as of 13:08, 25 March 2024
Summary Information
- Ownership: Total
 - Website: http://www.total.com/en
 - Location: St Fergus, Scotland
 - Capacity:
 
+++ Brief Description
- It is a 3-train process plant that is now known as the Frigg UK Terminal.
 - Gas is transported to the plant by the **Frigg UK Gas Pipeline System** and from the Vesterled Gas Pipeline which brings gas from the Norwegian sector
 - The Shetland Island Regional Gas Export Pipeline System (SIRGE) will permit the tie-in of West of Shetland gas into FUKA.
 - The SIRGE pipeline runs from the Shetland Gas Plant (SGP) at Sullom Voe on Shetland to a sub-sea tie-in on the FUKA Pipeline at the MCP01 bypass valves.
 
++++ Related Oil and Gas Fields
- It processes gas from the Alwyn Area (Alwyn North, Forvie, Grant, Jura, Nuggets, Islay, Dunbar and Ellon), Bruce, Rhum, Keith, Buzzard, the Flotta Catchment Area, Ross and Captain.
 
+++ Ongoing Projects
- -
 
+++ Other Information
- -
 
+++ History
- 1977 - Phase I of the plant was commissioned
 - 1978 - Phase II was completed
 
+++ Links