Difference between revisions of "Tuscarora Gas Transmission Company Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 30: | Line 30: | ||
# [[EIA Natural Gas Pipeline Projects 2000-2009]] | # [[EIA Natural Gas Pipeline Projects 2000-2009]] | ||
# [[Universalpegasus Pipeline References]] | # [[Universalpegasus Pipeline References]] | ||
| + | # [https://abarrelfull.blogspot.com/2024/02/tc-pipelines-lp-acquires-tuscarora-gas.html TC PipeLines, LP acquires Tuscarora Gas Transmission Company] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
[[category:USA]] | [[category:USA]] | ||
[[category:TC Energy]] | [[category:TC Energy]] | ||
Revision as of 08:17, 12 February 2024
Summary Information
- Source: Malin, Oregon, USA
- Destination: Wadsorth, Nevada, USA
- Ownership: Tuscarora Gas Transmission Company (Transcanada)
- Website: http://www.transcanada.com/tuscarora/
- Length: 491 kilometres (305 miles)
- Capacity: per day
- Status Operating
+++ Details
- The 305-mile (491-km) 20-inch-diameter Tuscarora Gas Transmission System delivers natural gas from the Western Canadian Sedimentary Basin, the Rocky Mountains and other US basins to communities in California and Nevada.
- Tuscarora extends from an interconnection with TransCanadas Gas Transmission Northwest Corporation System at the Malin Center Natural Gas Hub, Oregon, to its terminus near Wadsworth, Nevada, where it interconnects with Paiute Gas Pipeline.
+++ Contractors
- **UniversalPegasus:** Engineering design, preliminary survey, mapping, material procurement, and inspection services
+++ History
- 1995 - Constructed and placed into service
- 2000 - Hungry Valley Lateral Completed
- 2002 - System Expansion Phase I Completed
- 2008 - Further System Expansion Completed
+++ Other Information
- -
+++ Links