Difference between revisions of "Clipper Gas Field"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
| − | Summary Information  | + | === Summary Information ===  | 
* Operator: Shell  | * Operator: Shell  | ||
* Country: UK    | * Country: UK    | ||
| Line 9: | Line 9: | ||
* Production Volume:    | * Production Volume:    | ||
| − | + | === Description ===  | |
* The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea.    | * The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea.    | ||
* The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform.  | * The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform.  | ||
| Line 20: | Line 20: | ||
| − | + | === Contractors ===  | |
* '''Sembmarine SLP:'''    | * '''Sembmarine SLP:'''    | ||
** Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning  | ** Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning  | ||
| Line 33: | Line 33: | ||
* '''Icon Engineering:''' Skiff Platform Installation  | * '''Icon Engineering:''' Skiff Platform Installation  | ||
| − | + | === History ===  | |
* 1988 - Government approval for Clipper & Barque  | * 1988 - Government approval for Clipper & Barque  | ||
* 1990 - Barque PL Platform installed    | * 1990 - Barque PL Platform installed    | ||
| Line 44: | Line 44: | ||
* 2006 - Cutter QC Platform installed  | * 2006 - Cutter QC Platform installed  | ||
| − | + | === Geology ===  | |
*    | *    | ||
| − | + | === Links ===  | |
# [https://www.og.decc.gov.uk/web_files/ems/2012/Shell-ems.pdf Shell, EMS, 2011]  | # [https://www.og.decc.gov.uk/web_files/ems/2012/Shell-ems.pdf Shell, EMS, 2011]  | ||
# [http://sembmarineslp.com/case-studies/carrack/ Sembmarine SLP, Carrick]  | # [http://sembmarineslp.com/case-studies/carrack/ Sembmarine SLP, Carrick]  | ||
Revision as of 16:00, 30 January 2024
Summary Information
- Operator: Shell
 - Country: UK
 - Location: Block 048/19a, Southern North Sea
 - Production start: 1990
 - Partners:
 - Type: Gas
 - Estimated Reserves:
 - Production Volume:
 
Description
- The Clipper complex is the main installation for the Sole Pit fields. Situated 72 kilometres north east of the East Anglian coast in the Southern North Sea.
 - The Clipper is made up of five bridge-linked platforms – the wellhead platform, a production platform, a compression platform, a Riser Platform and a metering platform.
 - First operational in 1990, the installation produces and processes gas from the wells on wellhead platform and gas is also imported from the satellite platforms, producing from the **Barque** (049/16), **Cutter**, **Carrack Gas Field** ** Galleon** and **Skiff** (048/20a) fields.
 - The Barque field consists of 2 unmanned platforms, PL & PB
 - The Galleon field consists of 2 unmanned platforms, PN & PG
 - Cutter & Carrack have one platform each, Cutter QC and Carrack QA
 - The Skiff field consist of a minimum facilities, Skiff PS, normally unmanned installation (NUI), connected via a pipeline to the Clipper platform which provides processing and export facility for the Skiff fluids of gas, condensate and water
 - Gas is exported through a 24 inch diameter subsea pipeline to the Bacton Gas Plant in Norfolk.
 
Contractors
- Sembmarine SLP:
- Clipper PR Platform - EPIC lump sum contracted project including topsides, jacket and bridges, offshore hook-up and commissioning
 - Carrack QA Platform: EPC contracted project including topside, jacket and piles, offshore hook-up and commissioning
 
 - Rosetti Marino: Engineering, procurement, fabrication, testing, onshore commissioning, load-out and sea fastening of the Clipper Accommodation Module with integral Utility Deck and Helideck, the link bridge, the jacket and piles.
 - Stolt Offshore: Skiff subsea installation
 - Saipem: Pipeline T & I
 - FoundOcean:
- Barque PL Scour Rectification
 - Grouting for Skiff
 
 - Nessco: Communication systems
 - Icon Engineering: Skiff Platform Installation
 
History
- 1988 - Government approval for Clipper & Barque
 - 1990 - Barque PL Platform installed
 - 1990 - Clipper Gas Field came onstream
 - 1993 - Barque South approved
 - 1994 - First gas from Galleon
 - 1995 - Barque PB Platform installed
 - 2000 - Skiff development approved
 - 2005 - Cutter development approved
 - 2006 - Cutter QC Platform installed
 
Geology
Links
- Shell, EMS, 2011
 - Sembmarine SLP, Carrick
 - UK Oil and Gas Fields by Approval Date
 - List Of Oil Production Platforms In The UK
 - List Of Oil and Gas Production Platforms In The UK
 - FoundOcean Subsea References
 - Icon Engineering Platform References
 - Nessco Platform References
 - Rosetti Marino Platform References
 - Saipem Pipeline References
 - Serimax Pipeline References
 - Licence P 8 - Licence Having Effect Under The Petroleum Act 1998 The Skiff Field