Difference between revisions of "Kazakhstan China Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
| Line 3: | Line 3: | ||
* Source: Kazakhstan | * Source: Kazakhstan | ||
* Destination: China | * Destination: China | ||
| − | * Ownership: | + | * Ownership: Asia Gas Pipeline |
| − | * Website: | + | * Website: https://www.agp.com.kz/ |
| − | * Length: | + | * Length: 2,612 kilometres ( miles) |
| − | * Capacity: | + | * Capacity: 55 Billion Cubic Metres per Annum |
| − | * Status: | + | * Status: In operation |
=== Details === | === Details === | ||
* The design capacity of the main gas pipeline "Kazakhstan-China" is 55 billion m3 per year. Lines “A” and “B” transport 30 billion m3 of gas, whereas “C” line produces 25 billion m3. | * The design capacity of the main gas pipeline "Kazakhstan-China" is 55 billion m3 per year. Lines “A” and “B” transport 30 billion m3 of gas, whereas “C” line produces 25 billion m3. | ||
| + | * The goal of the pipeline is to ensure the transit of Turkmen and Uzbek gas in the direction of the People’s Republic of China, export Kazakhstan gas to the People’s Republic of China, as well as uninterrupted gas supply to the southern regions of Kazakhstan. | ||
| + | * The length of the gas pipeline through the territory of the Republic of Kazakhstan is 2,612 km for the A and B lines, 1 304 km for the C line. | ||
| − | |||
| − | |||
| − | |||
=== History === | === History === | ||
* 2007 - Agreement signed between China and Kazakhstan to build the pipeline | * 2007 - Agreement signed between China and Kazakhstan to build the pipeline | ||
| + | * 2018 - Line C was completed | ||
=== Links | === Links | ||
* [http://www.kaztransgas.kz/en/article/124 Project Webpage] | * [http://www.kaztransgas.kz/en/article/124 Project Webpage] | ||
* [http://www.rigzone.com/news/article.asp?a_id=102489&rss=true CNPC, KazMunaiGas Begin Phase 2 Construction on Gas Pipeline] | * [http://www.rigzone.com/news/article.asp?a_id=102489&rss=true CNPC, KazMunaiGas Begin Phase 2 Construction on Gas Pipeline] | ||
| + | |||
| + | [[category:Pipeline]] | ||
| + | [[category:Kazakhstan]] | ||
Latest revision as of 17:46, 14 January 2024
Summary Information
- Source: Kazakhstan
- Destination: China
- Ownership: Asia Gas Pipeline
- Website: https://www.agp.com.kz/
- Length: 2,612 kilometres ( miles)
- Capacity: 55 Billion Cubic Metres per Annum
- Status: In operation
Details
- The design capacity of the main gas pipeline "Kazakhstan-China" is 55 billion m3 per year. Lines “A” and “B” transport 30 billion m3 of gas, whereas “C” line produces 25 billion m3.
- The goal of the pipeline is to ensure the transit of Turkmen and Uzbek gas in the direction of the People’s Republic of China, export Kazakhstan gas to the People’s Republic of China, as well as uninterrupted gas supply to the southern regions of Kazakhstan.
- The length of the gas pipeline through the territory of the Republic of Kazakhstan is 2,612 km for the A and B lines, 1 304 km for the C line.
History
- 2007 - Agreement signed between China and Kazakhstan to build the pipeline
- 2018 - Line C was completed