Difference between revisions of "Western Isles FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Status) |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
=== Brief Description === | === Brief Description === | ||
− | * The FPSO | + | * The FPSO has Sevan Marine's characteristic cylindrical design |
− | * The vessel | + | * The vessel can produce and store up to 40,000 barrels of oil a day |
− | * The vessel | + | * The vessel displaces around 26,000 tonnes and can safely store up to 400,000 barrels of oil |
+ | * The FPSO is to be moved to the [[Buchan Oil Field]] | ||
=== Contractors === | === Contractors === |
Revision as of 12:12, 25 November 2023
Contents
Summary Information
- Name: Western Isles FPSO
- Field: Western Isles Oil Fields, Barra and Harris
- Country: UK
- Ownership:
- Website:
- Field Operated By: Dana Petroleum
- Capacity: 40,000 bpd
- Year of Completion:
Brief Description
- The FPSO has Sevan Marine's characteristic cylindrical design
- The vessel can produce and store up to 40,000 barrels of oil a day
- The vessel displaces around 26,000 tonnes and can safely store up to 400,000 barrels of oil
- The FPSO is to be moved to the Buchan Oil Field
Contractors
- **COSCO Nantong:** Vessel construction
- **Sevan Marine:** Technology Licence for the cylindrically shaped FPSO
- **Scana:** Delivery of mooring winches
- **ABB:** Providing power and automation technologies
Status
- In operation
History
- 2013 - Keel laying ceremony held
- 2014 - FPSO hull launch
- 2017 - First oil produced
Other Information
- -
Links
- Scana Industrier ASA - Scana Offshore Vestby signs new contract with Dana Petroleum for delivery of mooring winches
- Dana Petroleum lays keel for $400 million oil production vessel
- ABB wins $20 million FPSO order
- FPSO hull launch marks more than one million hours incident free on Dana’s Western Isles Project
- Dana Petroleum announces first oil from Western Isles