Difference between revisions of "Bahia LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
Line 2: Line 2:
  
 
* Ownership: Petrobras
 
* Ownership: Petrobras
* Website:  
+
* Website: https://petrobras.com.br/
* Location:  
+
* Location: Bahia
 
* Capacity: million tons/annum
 
* Capacity: million tons/annum
 
* Status: In operation
 
* Status: In operation
Line 9: Line 9:
 
=== Brief Description ===
 
=== Brief Description ===
 
* The terminal uses FSRU Sequoia  
 
* The terminal uses FSRU Sequoia  
 +
* The integrated pipeline is 45 km long and 28 inches in diameter and connects TR-BA to two delivery points, São Francisco do Conde Pressure Reducing Station and São Sebastião do Passé Flow Control Station
  
 
=== Technical Details ===
 
=== Technical Details ===
Line 34: Line 35:
 
-
 
-
 
=== Links ===
 
=== Links ===
 +
# [https://transpetro.com.br/transpetro-institucional/nossas-atividades/dutos-e-terminais/terminais-aquaviarios/trba-ba.htm Transpetro's Terminals]
 
# [https://abarrelfull.blogspot.com/2023/11/excelerate-becomes-first-private-sector.html Excelerate becomes the first private sector company to sell regasified LNG to customers in Brazil]
 
# [https://abarrelfull.blogspot.com/2023/11/excelerate-becomes-first-private-sector.html Excelerate becomes the first private sector company to sell regasified LNG to customers in Brazil]
 
# [https://abarrelfull.blogspot.com/2023/11/excelerate-energy-and-petrobras-sign-10.html Excelerate Energy and Petrobras Sign 10-Year Charter for FSRU Sequoia]
 
# [https://abarrelfull.blogspot.com/2023/11/excelerate-energy-and-petrobras-sign-10.html Excelerate Energy and Petrobras Sign 10-Year Charter for FSRU Sequoia]

Latest revision as of 10:03, 9 November 2023

Summary Information

Brief Description

  • The terminal uses FSRU Sequoia
  • The integrated pipeline is 45 km long and 28 inches in diameter and connects TR-BA to two delivery points, São Francisco do Conde Pressure Reducing Station and São Sebastião do Passé Flow Control Station

Technical Details

  • Storage capacity: 173,400 m3
  • Unloading capacity:
  • Send out capacity: 700 million cubic feet per day
  • Constructor:

Ongoing Projects/Project Status

  • Under construction

Suppliers / Customers

  • Suppliers:
  • Customers: Gas is supplied to the GASCAC Gas Pipeline

History

  • 2014 - Terminal operations began
  • 2021 - Excelerate Energy took over operations
  • 2023 - Excelerate Energy and Petrobras Sign 10-Year Charter

Other Information

-

Links

  1. Transpetro's Terminals
  2. Excelerate becomes the first private sector company to sell regasified LNG to customers in Brazil
  3. Excelerate Energy and Petrobras Sign 10-Year Charter for FSRU Sequoia