Difference between revisions of "Stampede TLP Oil and Gas Fields Development"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Hess * Country: USA * Location: Green Canyon blocks 511, 512, and 468, G of Mexico * Production start: Expected 2018 * Partners: Hess (20%), Ne...") |
Abarrelfull (talk | contribs) |
||
Line 4: | Line 4: | ||
* Location: Green Canyon blocks 511, 512, and 468, G of Mexico | * Location: Green Canyon blocks 511, 512, and 468, G of Mexico | ||
* Production start: Expected 2018 | * Production start: Expected 2018 | ||
− | * Partners: Hess | + | * Partners: Hess 25%; Chevron (25%); Equinor (25%); CNOOC (25%) |
* Type: Oil / Gas | * Type: Oil / Gas | ||
* Estimated Reserves: | * Estimated Reserves: | ||
Line 10: | Line 10: | ||
+++ Description | +++ Description | ||
− | * This Stampede TLP development is a joining of the **Pony** and **Knotty Head** discoveries and | + | * This Stampede TLP development is a joining of the **Pony** and **Knotty Head** discoveries and is located approximately 170 miles southeast of New Orleans in the Green Canyon Block 468 in a water depth of 3,350 feet |
* The Stampede field has total estimated recoverable resources in excess of 300 million barrels of oil equivalent | * The Stampede field has total estimated recoverable resources in excess of 300 million barrels of oil equivalent | ||
* The TLP, with dry topsides weight of 11,500 tons, is being designed to produce 80,000 BPD oil, 60,000 BPD water and 120 MMSCFD gas at capacity. | * The TLP, with dry topsides weight of 11,500 tons, is being designed to produce 80,000 BPD oil, 60,000 BPD water and 120 MMSCFD gas at capacity. | ||
* The Stampede lateral, at 16 miles in length and 18 inches in diameter, will connect the development to existing infrastructure | * The Stampede lateral, at 16 miles in length and 18 inches in diameter, will connect the development to existing infrastructure | ||
− | * Gas is transported on the | + | * Gas is transported on the [[Discovery Gas Pipeline System]] |
+++ Contractors | +++ Contractors | ||
Line 23: | Line 23: | ||
* **Oceaneering:** Supply of umbilicals and umbilical distribution hardware | * **Oceaneering:** Supply of umbilicals and umbilical distribution hardware | ||
− | + | === History | |
* 2005 - BHP Billiton Announces Knotty Head Discovery | * 2005 - BHP Billiton Announces Knotty Head Discovery | ||
* 2006 - Stampede discovered | * 2006 - Stampede discovered | ||
Line 32: | Line 32: | ||
* 2015 - Enbridge selected for pipeline | * 2015 - Enbridge selected for pipeline | ||
* 2017 - Platform delivered | * 2017 - Platform delivered | ||
+ | * 2018 - First oil produced | ||
+ | * 2023 - Chevron agreed to acquire Hess, becoming a partner | ||
− | + | === Geology | |
* Oil saturated sandstone in Miocene age reservoirs | * Oil saturated sandstone in Miocene age reservoirs | ||
− | + | === Links | |
− | # | + | # [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] |
# [http://killajoules.wikidot.com/archive:hess-corporation-announces-results-of-pony-2-well Hess Corporation Announces Results of Pony #2 Well] | # [http://killajoules.wikidot.com/archive:hess-corporation-announces-results-of-pony-2-well Hess Corporation Announces Results of Pony #2 Well] | ||
# [http://killajoules.wikidot.com/archive:bhp-billiton-announces-knotty-head-discovery-in-gulf BHP Billiton Announces Knotty Head Discovery In Gulf Of Mexico] | # [http://killajoules.wikidot.com/archive:bhp-billiton-announces-knotty-head-discovery-in-gulf BHP Billiton Announces Knotty Head Discovery In Gulf Of Mexico] | ||
Line 49: | Line 51: | ||
# [http://killajoules.wikidot.com/blog:5715 Oceaneering Announces Hess Stampede Project Umbilicals and Distribution Hardware Contract Award] | # [http://killajoules.wikidot.com/blog:5715 Oceaneering Announces Hess Stampede Project Umbilicals and Distribution Hardware Contract Award] | ||
# [http://killajoules.wikidot.com/archive:successful-completion-and-delivery-of-the-sixth-mode Successful Completion and Delivery of the Sixth MODEC TLP] | # [http://killajoules.wikidot.com/archive:successful-completion-and-delivery-of-the-sixth-mode Successful Completion and Delivery of the Sixth MODEC TLP] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/10/chevron-announces-agreement-to-acquire.html Chevron announces agreement to acquire Hess] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:USA]] | ||
+ | [[category:Hess]] |
Revision as of 15:44, 23 October 2023
Summary Information
- Operator: Hess
- Country: USA
- Location: Green Canyon blocks 511, 512, and 468, G of Mexico
- Production start: Expected 2018
- Partners: Hess 25%; Chevron (25%); Equinor (25%); CNOOC (25%)
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- This Stampede TLP development is a joining of the **Pony** and **Knotty Head** discoveries and is located approximately 170 miles southeast of New Orleans in the Green Canyon Block 468 in a water depth of 3,350 feet
- The Stampede field has total estimated recoverable resources in excess of 300 million barrels of oil equivalent
- The TLP, with dry topsides weight of 11,500 tons, is being designed to produce 80,000 BPD oil, 60,000 BPD water and 120 MMSCFD gas at capacity.
- The Stampede lateral, at 16 miles in length and 18 inches in diameter, will connect the development to existing infrastructure
- Gas is transported on the Discovery Gas Pipeline System
+++ Contractors
- **MODEC:** Engineering and Management Services for the Stampede tension leg platform
- **Wood Group Mustang:** Front-End Engineering
- **Proserv:** Provision of a 12-well subsea control system along with associated topside and subsea interface equipment
- **Subsea 7:** Installation of flowlines, steel catenary risers, umbilicals, jumpers and associated subsea architecture
- **Oceaneering:** Supply of umbilicals and umbilical distribution hardware
=== History
- 2005 - BHP Billiton Announces Knotty Head Discovery
- 2006 - Stampede discovered
- 2007 - First Pony appraisal well drilled
- 2008 - Pony #2 appraisal well drilled
- 2013 - Modec awarded TLP contract
- 2014 - Final investment decision taken
- 2015 - Enbridge selected for pipeline
- 2017 - Platform delivered
- 2018 - First oil produced
- 2023 - Chevron agreed to acquire Hess, becoming a partner
=== Geology
- Oil saturated sandstone in Miocene age reservoirs
=== Links
- Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields
- Hess Corporation Announces Results of Pony #2 Well
- BHP Billiton Announces Knotty Head Discovery In Gulf Of Mexico
- Hess Announces Successful Pony Deepwater Sidetrack Well
- MODEC Awarded HESS Stampede TLP ECM Contract
- Wood Group Mustang Performing Front-End Engineering for Hess' Stampede Tension Leg Platform (TLP)
- Chevron Sanctions Stampede Project in the Deepwater U.S. Gulf of Mexico
- Proserv secures significant contract with Hess Corporation
- Subsea 7 S.A. awarded an installation contract in the US Gulf of Mexico
- Enbridge Selected to Provide Crude Oil Pipeline for Deepwater Gulf of Mexico Development
- Oceaneering Announces Hess Stampede Project Umbilicals and Distribution Hardware Contract Award
- Successful Completion and Delivery of the Sixth MODEC TLP
- Chevron announces agreement to acquire Hess