(Created page with " (SEML) Southeast Mainline System Reversal ANR Pipeline Reversal Completed 01/12/2015 2015 Elko Area Expansion Project Paiute Pipeline Lateral Completed 07/10/2015 Broad Run F...")
 
Line 1: Line 1:
  
−
(SEML) Southeast Mainline System Reversal ANR Pipeline Reversal Completed 01/12/2015
+
• (SEML) Southeast Mainline System Reversal ANR Pipeline Reversal Completed 01/12/2015
−
2015 Elko Area Expansion Project Paiute Pipeline Lateral Completed 07/10/2015
+
• 2015 Elko Area Expansion Project Paiute Pipeline Lateral Completed 07/10/2015
−
Broad Run Flexibility Project Tennessee Gas Pipeline Co Reversal Completed 01/11/2015
+
• Broad Run Flexibility Project Tennessee Gas Pipeline Co Reversal Completed 01/11/2015
−
Carty Lateral Project Gas Transmission Northwest Lateral Completed 04/11/2015
+
• Carty Lateral Project Gas Transmission Northwest Lateral Completed 04/11/2015
−
Creole Trail Expansion Project 1 Cheniere Creole Trail Pipeline Reversal Completed 27/04/2015
+
• Creole Trail Expansion Project 1 Cheniere Creole Trail Pipeline Reversal Completed 27/04/2015
−
East Side Expansion Project Columbia Pipeline Expansion Completed 30/10/2015
+
• East Side Expansion Project Columbia Pipeline Expansion Completed 30/10/2015
−
East Side Expansion Project Columbia Gas Transmission Expansion Completed 30/09/2015
+
• East Side Expansion Project Columbia Gas Transmission Expansion Completed 30/09/2015
−
Edgemoor Compressor Station Dominion Carolina Gas Transmission Expansion Completed 01/12/2015
+
• Edgemoor Compressor Station Dominion Carolina Gas Transmission Expansion Completed 01/12/2015
−
Edinburg Lateral Houston Pipe Line Expansion Completed 08/06/2015
+
• Edinburg Lateral Houston Pipe Line Expansion Completed 08/06/2015
−
Junction Platform Project Discovery Gas Transmission LLC New Pipeline Completed 07/02/2015
+
• Junction Platform Project Discovery Gas Transmission LLC New Pipeline Completed 07/02/2015
−
Kingsport Expansion East Tennessee Nat Gas Co Expansion Completed 01/01/2015
+
• Kingsport Expansion East Tennessee Nat Gas Co Expansion Completed 01/01/2015
−
Lebanon lateral project ANR Pipeline Reversal Completed 01/05/2015
+
• Lebanon lateral project ANR Pipeline Reversal Completed 01/05/2015
−
Leidy Southeast Expansion Transcontinental Gas Pipeline Expansion Completed 05/01/2016
+
• Leidy Southeast Expansion Transcontinental Gas Pipeline Expansion Completed 05/01/2016
−
Line N West Side Expansion and Modernization Project NiSource Gas Transmission & Storage Expansion Completed 24/09/2015
+
• Line N West Side Expansion and Modernization Project NiSource Gas Transmission & Storage Expansion Completed 24/09/2015
−
Mobile Bay South III Expansion Project Transcontinental Gas Pipeline Expansion Completed 27/03/2015
+
• Mobile Bay South III Expansion Project Transcontinental Gas Pipeline Expansion Completed 27/03/2015
−
Niagara Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/10/2015
+
• Niagara Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/10/2015
−
Northern Access 2015 Project National Fuel Gas Supply Corp Expansion Completed 03/12/2015
+
• Northern Access 2015 Project National Fuel Gas Supply Corp Expansion Completed 03/12/2015
−
Ohio Pipeline Energy Network Texas Eastern Transmission Reversal Completed 01/12/2015
+
• Ohio Pipeline Energy Network Texas Eastern Transmission Reversal Completed 01/12/2015
−
SESH Expansion Project Southeast Supply Header LLC Expansion Completed 12/11/2015
+
• SESH Expansion Project Southeast Supply Header LLC Expansion Completed 12/11/2015
−
Sulphur Springs Compression Project ANR Pipeline Expansion Completed 22/10/2015
+
• Sulphur Springs Compression Project ANR Pipeline Expansion Completed 22/10/2015
−
Transco Rockaway Delivery Project Transcontinental Gas Pipeline New Pipeline Completed 14/05/2015
+
• Transco Rockaway Delivery Project Transcontinental Gas Pipeline New Pipeline Completed 14/05/2015
−
Tuscarora Lateral Project Empire Pipeline Lateral Completed 04/11/2015
+
• Tuscarora Lateral Project Empire Pipeline Lateral Completed 04/11/2015
−
Uniontown to Gas City Expansion Project (U2GC) (bi-directional) Texas Eastern Transmission Reversal Completed 28/08/2015
+
• Uniontown to Gas City Expansion Project (U2GC) (bi-directional) Texas Eastern Transmission Reversal Completed 28/08/2015
−
Virginia Southside Expansion Transcontinental Gas Pipeline Expansion Completed 27/08/2015
+
• Virginia Southside Expansion Transcontinental Gas Pipeline Expansion Completed 27/08/2015
−
West Leg 2015 Expansion Northern Natural Gas Co Expansion Completed 31/10/2015
+
• West Leg 2015 Expansion Northern Natural Gas Co Expansion Completed 31/10/2015
−
Woodbridge lateral Transcontinental Gas Pipeline Lateral Completed 26/03/2015
+
• Woodbridge lateral Transcontinental Gas Pipeline Lateral Completed 26/03/2015
−
Zone 3 East-to-West Project Rockies Express Pipeline Reversal Completed 01/09/2015
+
• Zone 3 East-to-West Project Rockies Express Pipeline Reversal Completed 01/09/2015
−
Algonquin Incremental Market (AIM) Algonquin Gas Transmission Expansion Completed 30/12/2016
+
• Algonquin Incremental Market (AIM) Algonquin Gas Transmission Expansion Completed 30/12/2016
−
Chicago Market Expansion Project Phase 1 Nat Gas P L Co of America Expansion Completed 01/11/2016
+
• Chicago Market Expansion Project Phase 1 Nat Gas P L Co of America Expansion Completed 01/11/2016
−
Clarington Project Dominion Transmission Expansion Completed 19/10/2016
+
• Clarington Project Dominion Transmission Expansion Completed 19/10/2016
−
Columbia to Eastover Pipeline Dominion Carolina Gas Transmission New Pipeline Completed 01/11/2016
+
• Columbia to Eastover Pipeline Dominion Carolina Gas Transmission New Pipeline Completed 01/11/2016
−
Columbia to Eastover Pipeline Dominion Carolina Gas Transmission New Pipeline Construction
+
• Columbia to Eastover Pipeline Dominion Carolina Gas Transmission New Pipeline Construction
−
Creole Trail Expansion Project 2 Cheniere Creole Trail Pipeline Reversal Approved
+
• Creole Trail Expansion Project 2 Cheniere Creole Trail Pipeline Reversal Approved
−
EEC Modification Project Elba Express Co Expansion Construction
+
• EEC Modification Project Elba Express Co Expansion Construction
−
Gulf Markets Expansion Phase 1 (bi-directional) Texas Eastern Transmission Reversal Completed 04/10/2016
+
• Gulf Markets Expansion Phase 1 (bi-directional) Texas Eastern Transmission Reversal Completed 04/10/2016
−
Lebanon West II Dominion Transmission Expansion Completed 01/11/2016
+
• Lebanon West II Dominion Transmission Expansion Completed 01/11/2016
−
Loudon Expansion Project East Tennessee Nat Gas Co Expansion Completed 01/09/2016
+
• Loudon Expansion Project East Tennessee Nat Gas Co Expansion Completed 01/09/2016
−
Malaga Lateral Project Transwestern Pipeline Co Lateral Completed 17/04/2016
+
• Malaga Lateral Project Transwestern Pipeline Co Lateral Completed 17/04/2016
−
Ohio Valley Connector Equitrans Expansion Completed 01/10/2016
+
• Ohio Valley Connector Equitrans Expansion Completed 01/10/2016
−
Ohio-Louisiana Access project Texas Gas Transmission Reversal Completed 27/05/2016
+
• Ohio-Louisiana Access project Texas Gas Transmission Reversal Completed 27/05/2016
−
Pipeline Zone 3 Capacity Enhancement Rockies Express Pipeline Reversal Completed 30/12/2016
+
• Pipeline Zone 3 Capacity Enhancement Rockies Express Pipeline Reversal Completed 30/12/2016
−
Roadrunner Gas Transmission phase 1 Roadrunner Gas Transmission New Pipeline Completed 10/03/2016
+
• Roadrunner Gas Transmission phase 1 Roadrunner Gas Transmission New Pipeline Completed 10/03/2016
−
Roadrunner Gas Transmission phase 2 Roadrunner Gas Transmission Expansion Completed 01/10/2016
+
• Roadrunner Gas Transmission phase 2 Roadrunner Gas Transmission Expansion Completed 01/10/2016
−
Rock Springs Expansion Transcontinental Gas Pipeline Lateral Completed 01/08/2016
+
• Rock Springs Expansion Transcontinental Gas Pipeline Lateral Completed 01/08/2016
−
Salem Lateral Project Algonquin Gas Transmission Lateral Completed 30/11/2016
+
• Salem Lateral Project Algonquin Gas Transmission Lateral Completed 30/11/2016
−
Silo Pipeline Project Kaiser-Frontier Midstream Lateral Completed 23/06/2016
+
• Silo Pipeline Project Kaiser-Frontier Midstream Lateral Completed 23/06/2016
−
Southern Indiana Market Project Texas Gas Transmission Lateral Completed 17/06/2016
+
• Southern Indiana Market Project Texas Gas Transmission Lateral Completed 17/06/2016
−
St. Charles Project Dominion Cove Point LNG PL Co Expansion Completed 27/05/2016
+
• St. Charles Project Dominion Cove Point LNG PL Co Expansion Completed 27/05/2016
−
TETCO Capacity Expansion Project Eastern Shore Natural Gas Expansion Completed 01/07/2016
+
• TETCO Capacity Expansion Project Eastern Shore Natural Gas Expansion Completed 01/07/2016
−
TETCO Capacity Expansion Project Eastern Shore Natural Gas Expansion Applied
+
• TETCO Capacity Expansion Project Eastern Shore Natural Gas Expansion Applied
−
Utica Access Project Columbia Gas Transmission Lateral Completed 30/09/2016
+
• Utica Access Project Columbia Gas Transmission Lateral Completed 30/09/2016
−
Western Kentucky Lateral Project Texas Gas Transmission Lateral Completed 26/08/2016
+
• Western Kentucky Lateral Project Texas Gas Transmission Lateral Completed 26/08/2016
−
WesTex Expansion ONEOK WesTex Pipeline Expansion Completed 01/10/2016
+
• WesTex Expansion ONEOK WesTex Pipeline Expansion Completed 01/10/2016
−
Zone 3 Expansion Southern Natural Gas Co Expansion Completed 02/09/2016
+
• Zone 3 Expansion Southern Natural Gas Co Expansion Completed 02/09/2016
−
Access South Project Texas Eastern Transmission Reversal Completed 31/10/2017
+
• Access South Project Texas Eastern Transmission Reversal Completed 31/10/2017
−
Adair Southwest Project Texas Eastern Transmission Reversal Completed 31/10/2017
+
• Adair Southwest Project Texas Eastern Transmission Reversal Completed 31/10/2017
−
ANR Collierville Expansion Project ANR Pipeline Expansion Completed 14/11/2017
+
• ANR Collierville Expansion Project ANR Pipeline Expansion Completed 14/11/2017
−
Atlantic Bridge project Phase 1 Algonquin Gas Transmission Expansion Completed 01/11/2017
+
• Atlantic Bridge project Phase 1 Algonquin Gas Transmission Expansion Completed 01/11/2017
−
Atlantic Sunrise Project Phase IA Transcontinental Gas Pipeline Reversal Completed
+
• Atlantic Sunrise Project Phase IA Transcontinental Gas Pipeline Reversal Completed
−
Cameron Pipeline Expansion Sempra LNG Reversal Completed 28/03/2017
+
• Cameron Pipeline Expansion Sempra LNG Reversal Completed 28/03/2017
−
Canton Pipeline SemGroup Corp New Pipeline Completed 01/12/2017
+
• Canton Pipeline SemGroup Corp New Pipeline Completed 01/12/2017
−
Comanche Trail Pipeline Comanche Trail Pipeline LLC New Pipeline Completed 30/01/2017
+
• Comanche Trail Pipeline Comanche Trail Pipeline LLC New Pipeline Completed 30/01/2017
−
Connecticut Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017
+
• Connecticut Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017
−
Dominion Keys Energy Center Dominion Cove Point LNG PL Co Expansion Completed 01/03/2017
+
• Dominion Keys Energy Center Dominion Cove Point LNG PL Co Expansion Completed 01/03/2017
−
Florida Southeast Connection NextEra Energy New Pipeline Completed 12/06/2017
+
• Florida Southeast Connection NextEra Energy New Pipeline Completed 12/06/2017
−
Gaines County Crossover Compressor Station Northern Natural Gas Co Expansion Completed 01/06/2017
+
• Gaines County Crossover Compressor Station Northern Natural Gas Co Expansion Completed 01/06/2017
−
Garden State Expansion Phase 1 Transcontinental Gas PipeLine Expansion Completed 09/09/2017
+
• Garden State Expansion Phase 1 Transcontinental Gas PipeLine Expansion Completed 09/09/2017
−
Gulf Markets Expansion Phase 2 (bi-directional) Texas Eastern Transmission Reversal Completed 01/08/2017
+
• Gulf Markets Expansion Phase 2 (bi-directional) Texas Eastern Transmission Reversal Completed 01/08/2017
−
Gulf Trace Expansion Project Transcontinental Gas Pipeline Lateral Completed 01/01/2017
+
• Gulf Trace Expansion Project Transcontinental Gas Pipeline Lateral Completed 01/01/2017
−
Hillabee Expansion phase 1 Transcontinental Gas Pipeline Expansion Completed 07/06/2017
+
• Hillabee Expansion phase 1 Transcontinental Gas Pipeline Expansion Completed 07/06/2017
−
Impulsora Pipeline Nueva Era Pipeline New Pipeline Completed 01/12/2017
+
• Impulsora Pipeline Nueva Era Pipeline New Pipeline Completed 01/12/2017
−
Jacksonville Expansion Project Florida Gas Trans Co Expansion Completed 01/06/2017
+
• Jacksonville Expansion Project Florida Gas Trans Co Expansion Completed 01/06/2017
−
Keys Energy Project Dominion Cove Point LNG PL Co Expansion Completed 21/03/2017
+
• Keys Energy Project Dominion Cove Point LNG PL Co Expansion Completed 21/03/2017
−
Lebanon Extension Project Texas Eastern Transmission Reversal Completed 26/07/2017
+
• Lebanon Extension Project Texas Eastern Transmission Reversal Completed 26/07/2017
−
Leidy South Project Dominion Transmission Expansion Completed 27/09/2017
+
• Leidy South Project Dominion Transmission Expansion Completed 27/09/2017
−
Natchez Pipeline Project (Midla) American Midstream (MidLa) New Pipeline Completed 29/03/2017
+
• Natchez Pipeline Project (Midla) American Midstream (MidLa) New Pipeline Completed 29/03/2017
−
Nautilus Gas Gathering System Crestwood Permian Basin New Pipeline Completed 01/06/2017
+
• Nautilus Gas Gathering System Crestwood Permian Basin New Pipeline Completed 01/06/2017
−
New Market Project Dominion Transmission Expansion Completed 01/11/2017
+
• New Market Project Dominion Transmission Expansion Completed 01/11/2017
−
New York Bay Expansion Project Transcontinental Gas Pipeline Expansion Completed 06/10/2017
+
• New York Bay Expansion Project Transcontinental Gas Pipeline Expansion Completed 06/10/2017
−
Northern Lights 2017 Expansion Northern Natural Gas Co Expansion Completed 01/11/2017
+
• Northern Lights 2017 Expansion Northern Natural Gas Co Expansion Completed 01/11/2017
−
Northern Supply Access Project Texas Gas Transmission Reversal Completed 02/03/2017
+
• Northern Supply Access Project Texas Gas Transmission Reversal Completed 02/03/2017
−
Orion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017
+
• Orion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017
−
Panhandle Backhaul Project Panhandle Eastern Pipeline Co Reversal Completed 31/08/2017
+
• Panhandle Backhaul Project Panhandle Eastern Pipeline Co Reversal Completed 31/08/2017
−
PNGTS C2C Expansion Project Portland Natural Gas Transmission System Expansion Completed 01/12/2017
+
• PNGTS C2C Expansion Project Portland Natural Gas Transmission System Expansion Completed 01/12/2017
−
Rayne XPress Project Columbia Gulf Transmission Reversal Completed 01/12/2017
+
• Rayne XPress Project Columbia Gulf Transmission Reversal Completed 01/12/2017
−
Rover Pipeline Project Phase 1 ET Rover Pipeline New Pipeline Completed 01/09/2017
+
• Rover Pipeline Project Phase 1 ET Rover Pipeline New Pipeline Completed 01/09/2017
−
Sabal Trail Project Phase I Spectra Energy Corp/NextEra Energy/Duke Energy New Pipeline Completed 07/06/2017
+
• Sabal Trail Project Phase I Spectra Energy Corp/NextEra Energy/Duke Energy New Pipeline Completed 07/06/2017
−
Susquehanna West Project Tennessee Gas Pipeline Co Reversal Completed 30/08/2017
+
• Susquehanna West Project Tennessee Gas Pipeline Co Reversal Completed 30/08/2017
−
System Reliability Project Eastern Shore Natural Gas Expansion Completed 15/06/2017
+
• System Reliability Project Eastern Shore Natural Gas Expansion Completed 15/06/2017
−
Transco Dalton Expansion Project Transcontinental Gas Pipeline Lateral Completed 01/04/2017
+
• Transco Dalton Expansion Project Transcontinental Gas Pipeline Lateral Completed 01/04/2017
−
Trans-Pecos Pipeline Trans-Pecos Pipeline LLC New Pipeline Completed 31/03/2017
+
• Trans-Pecos Pipeline Trans-Pecos Pipeline LLC New Pipeline Completed 31/03/2017
−
Triad Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017
+
• Triad Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017
−
Trunkline Backhaul Project Trunkline Gas Co Reversal Completed 31/08/2017
+
• Trunkline Backhaul Project Trunkline Gas Co Reversal Completed 31/08/2017
−
UGI Sunbury Pipeline UGI Energy Services Lateral Completed 03/01/2017
+
• UGI Sunbury Pipeline UGI Energy Services Lateral Completed 03/01/2017
−
Virginia Southside Expansion Project II Transcontinental Gas Pipeline Lateral Completed 04/12/2017
+
• Virginia Southside Expansion Project II Transcontinental Gas Pipeline Lateral Completed 04/12/2017
−
White Oak Mainline Expansion Project Eastern Shore Natural Gas Expansion Completed 10/03/2017
+
• White Oak Mainline Expansion Project Eastern Shore Natural Gas Expansion Completed 10/03/2017
−
2018 Paiute Expansion Project Paiute Pipeline Expansion Completed 04/12/2018
+
• 2018 Paiute Expansion Project Paiute Pipeline Expansion Completed 04/12/2018
−
Agua Blanca Pipeline WhiteWater New Pipeline Completed 01/04/2018
+
• Agua Blanca Pipeline WhiteWater New Pipeline Completed 01/04/2018
−
Allen Compressor Station Modification Project Enable Gas Transmission Expansion Completed 25/09/2018
+
• Allen Compressor Station Modification Project Enable Gas Transmission Expansion Completed 25/09/2018
−
Appalachian Lease Project (TEAL) Phase 1 Texas Eastern Transmission Lateral Completed 09/11/2018
+
• Appalachian Lease Project (TEAL) Phase 1 Texas Eastern Transmission Lateral Completed 09/11/2018
−
Atlantic Sunrise Project Phase 1B Transcontinental Gas Pipeline Reversal Completed 01/06/2018
+
• Atlantic Sunrise Project Phase 1B Transcontinental Gas Pipeline Reversal Completed 01/06/2018
−
Atlantic Sunrise Project Phase II Transcontinental Gas Pipeline Reversal Completed 04/10/2018
+
• Atlantic Sunrise Project Phase II Transcontinental Gas Pipeline Reversal Completed 04/10/2018
−
Bakken Line 27 Expansion MDU Resources Group Expansion Completed 15/09/2018
+
• Bakken Line 27 Expansion MDU Resources Group Expansion Completed 15/09/2018
−
Bayway Lateral Project Texas Eastern Transmission Lateral Completed 03/01/2018
+
• Bayway Lateral Project Texas Eastern Transmission Lateral Completed 03/01/2018
−
Birdsboro Pipeline Project DTE Midstream Appalachia, LLC New Pipeline Completed 10/12/2018
+
• Birdsboro Pipeline Project DTE Midstream Appalachia, LLC New Pipeline Completed 10/12/2018
−
Blue Mountain Chisholm Trail Project Southern Star Central Gas Pipeline Lateral Completed 09/06/2018
+
• Blue Mountain Chisholm Trail Project Southern Star Central Gas Pipeline Lateral Completed 09/06/2018
−
Broad Run Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/06/2018
+
• Broad Run Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/06/2018
−
Bushy Park Extension Project Dominion Energy Carolina Gas Expansion Completed 09/12/2018
+
• Bushy Park Extension Project Dominion Energy Carolina Gas Expansion Completed 09/12/2018
−
Cameron Access Project Columbia Gulf Transmission Reversal Completed 13/03/2018
+
• Cameron Access Project Columbia Gulf Transmission Reversal Completed 13/03/2018
−
Cana STACK Expansion Project Enable Gas Transmission Expansion Completed 01/10/2018
+
• Cana STACK Expansion Project Enable Gas Transmission Expansion Completed 01/10/2018
−
Cedar Station Upgrade Project Northern Natural Gas Co Expansion Completed 15/11/2018
+
• Cedar Station Upgrade Project Northern Natural Gas Co Expansion Completed 15/11/2018
−
Central Virginia Connector Columbia Gas Transmission New Pipeline Completed 04/09/2018
+
• Central Virginia Connector Columbia Gas Transmission New Pipeline Completed 04/09/2018
−
Cheniere Corpus Christi Pipeline Project Cheniere Corpus Christi Pipeline New Pipeline Completed 23/05/2018
+
• Cheniere Corpus Christi Pipeline Project Cheniere Corpus Christi Pipeline New Pipeline Completed 23/05/2018
−
Cheyenne Compressor Station Expansion Project Wyoming Interstate Gas Co Expansion Completed 23/05/2018
+
• Cheyenne Compressor Station Expansion Project Wyoming Interstate Gas Co Expansion Completed 23/05/2018
−
Chicago Market Expansion Project Phase 2 Nat Gas P L Co of America Expansion On Hold
+
• Chicago Market Expansion Project Phase 2 Nat Gas P L Co of America Expansion On Hold
−
CIG 2018 Line Nos. 5A and 5B Expansion Project Colorado Interstate Gas Co Expansion Completed 09/05/2018
+
• CIG 2018 Line Nos. 5A and 5B Expansion Project Colorado Interstate Gas Co Expansion Completed 09/05/2018
−
Coastal Bend Header Gulf South Pipeline Lateral Completed 01/04/2018
+
• Coastal Bend Header Gulf South Pipeline Lateral Completed 01/04/2018
−
CPV Valley lateral project Millennium Pipeline Lateral Completed 09/07/2018
+
• CPV Valley lateral project Millennium Pipeline Lateral Completed 09/07/2018
−
EEC Modification Project Elba Express Co Expansion Completed 14/11/2018
+
• EEC Modification Project Elba Express Co Expansion Completed 14/11/2018
−
Fairburn Expansion Project Southern Natural Gas Co Expansion Completed 12/12/2018
+
• Fairburn Expansion Project Southern Natural Gas Co Expansion Completed 12/12/2018
−
FGT Western Division Project Florida Gas Trans Co Expansion Completed 25/10/2018
+
• FGT Western Division Project Florida Gas Trans Co Expansion Completed 25/10/2018
−
Fox Energy Center Natural Gas Lateral Project Wisconsin Public Service Corp Lateral Completed 31/10/2018
+
• Fox Energy Center Natural Gas Lateral Project Wisconsin Public Service Corp Lateral Completed 31/10/2018
−
Garden State Expansion Phase 2 Transcontinental Gas Pipeline Expansion Completed 16/03/2018
+
• Garden State Expansion Phase 2 Transcontinental Gas Pipeline Expansion Completed 16/03/2018
−
Impulsora Pipeline Crossing Project Impulsora Pipeline New Pipeline Completed 30/05/2018
+
• Impulsora Pipeline Crossing Project Impulsora Pipeline New Pipeline Completed 30/05/2018
−
KM Border Pipeline Expansion Kinder Morgan Border Pipeline LLC Expansion Completed 20/02/2018
+
• KM Border Pipeline Expansion Kinder Morgan Border Pipeline LLC Expansion Completed 20/02/2018
−
Leach XPress project Columbia Gas Transmission Reversal Completed 01/01/2018
+
• Leach XPress project Columbia Gas Transmission Reversal Completed 01/01/2018
−
Line YM28 and Line FM120 Modernization Project National Fuel Gas Supply Corp Expansion Completed 22/12/2018
+
• Line YM28 and Line FM120 Modernization Project National Fuel Gas Supply Corp Expansion Completed 22/12/2018
−
Lone Star Expansion Tennessee Gas Pipeline Co Expansion Completed 28/11/2018
+
• Lone Star Expansion Tennessee Gas Pipeline Co Expansion Completed 28/11/2018
−
NEXUS Gas Transmission Spectra Energy New Pipeline Completed 10/10/2018
+
• NEXUS Gas Transmission Spectra Energy New Pipeline Completed 10/10/2018
−
NGPL Gulf Coast Southbound Phase I Nat Gas P L Co of America Reversal Completed 04/10/2018
+
• NGPL Gulf Coast Southbound Phase I Nat Gas P L Co of America Reversal Completed 04/10/2018
−
Okeechobee Lateral Project Florida Southeast Connection LLC Lateral Completed 30/08/2018
+
• Okeechobee Lateral Project Florida Southeast Connection LLC Lateral Completed 30/08/2018
−
Permian North Expansion Project El Paso Natural Gas Expansion Completed 05/12/2018
+
• Permian North Expansion Project El Paso Natural Gas Expansion Completed 05/12/2018
−
Pomelo Connector Pipeline Texas Eastern Transmission Expansion Completed 28/11/2018
+
• Pomelo Connector Pipeline Texas Eastern Transmission Expansion Completed 28/11/2018
−
Portland Xpress Project Phase 1 (CAN to ME) Portland Natural Gas Transmission System Expansion Completed 01/11/2018
+
• Portland Xpress Project Phase 1 (CAN to ME) Portland Natural Gas Transmission System Expansion Completed 01/11/2018
−
Portland Xpress Project Phase 1 (ME to MA) Portland Natural Gas Transmission System Expansion Completed 01/11/2018
+
• Portland Xpress Project Phase 1 (ME to MA) Portland Natural Gas Transmission System Expansion Completed 01/11/2018
−
Project Wildcat Enable Gas Transmission New Pipeline Completed 01/08/2018
+
• Project Wildcat Enable Gas Transmission New Pipeline Completed 01/08/2018
−
Red Bluff Express Pipeline Energy Transfer Co New Pipeline Completed 01/05/2018
+
• Red Bluff Express Pipeline Energy Transfer Co New Pipeline Completed 01/05/2018
−
Revolution Pipeline Project Energy Transfer Co New Pipeline Completed 28/02/2018
+
• Revolution Pipeline Project Energy Transfer Co New Pipeline Completed 28/02/2018
−
Rover Pipeline Project Phase 2 ET Rover Pipeline New Pipeline Completed 01/06/2018
+
• Rover Pipeline Project Phase 2 ET Rover Pipeline New Pipeline Completed 01/06/2018
−
Sabine Pass Expansion Project (formerly Sabine Pass Liquefaction Lateral and Tap) Kinder Morgan Energy Partners Lateral Completed 11/12/2018
+
• Sabine Pass Expansion Project (formerly Sabine Pass Liquefaction Lateral and Tap) Kinder Morgan Energy Partners Lateral Completed 11/12/2018
−
Sooner Trails Project Southern Star Central Gas Pipeline Expansion Cancelled
+
• Sooner Trails Project Southern Star Central Gas Pipeline Expansion Cancelled
−
South Alabama Project Florida Gas Trans Co Expansion Completed 26/11/2018
+
• South Alabama Project Florida Gas Trans Co Expansion Completed 26/11/2018
−
South Saskatchewan Access Project Steel Reef Pipelines US LLC New Pipeline Completed 14/12/2018
+
• South Saskatchewan Access Project Steel Reef Pipelines US LLC New Pipeline Completed 14/12/2018
−
South Texas Expansion Project Enbridge Energy Pipeline Co Reversal Completed 28/11/2018
+
• South Texas Expansion Project Enbridge Energy Pipeline Co Reversal Completed 28/11/2018
−
Southwest Louisiana Supply Project Tennessee Gas Pipeline Co Reversal Completed 09/03/2018
+
• Southwest Louisiana Supply Project Tennessee Gas Pipeline Co Reversal Completed 09/03/2018
−
St. Charles Parish Expansion Project Gulf South Pipeline Expansion Completed 31/10/2018
+
• St. Charles Parish Expansion Project Gulf South Pipeline Expansion Completed 31/10/2018
−
TGP Rio Bravo Hidalgo Expansion Tennessee Gas Pipeline Co Expansion Completed 05/07/2018
+
• TGP Rio Bravo Hidalgo Expansion Tennessee Gas Pipeline Co Expansion Completed 05/07/2018
−
Transco to Charleston Project Dominion Carolina Gas Transmission Expansion Completed 27/02/2018
+
• Transco to Charleston Project Dominion Carolina Gas Transmission Expansion Completed 27/02/2018
−
Valley Expansion Project WBI Energy Transmission Expansion Completed 31/10/2018
+
• Valley Expansion Project WBI Energy Transmission Expansion Completed 31/10/2018
−
WB (West Bound) Xpress (East) Columbia Gas Transmission Expansion Completed 15/11/2018
+
• WB (West Bound) Xpress (East) Columbia Gas Transmission Expansion Completed 15/11/2018
−
WB (West Bound) Xpress (west) Columbia Gas Transmission Expansion Completed 04/10/2018
+
• WB (West Bound) Xpress (west) Columbia Gas Transmission Expansion Completed 04/10/2018
−
Wisconsin South Expansion Project ANR Pipeline Expansion Completed 11/11/2018
+
• Wisconsin South Expansion Project ANR Pipeline Expansion Completed 11/11/2018
−
Appalachian Lease Project (TEAL) Phase 2 Texas Eastern Transmission Lateral Completed 01/04/2019
+
• Appalachian Lease Project (TEAL) Phase 2 Texas Eastern Transmission Lateral Completed 01/04/2019
−
Demicks Lake-Cherry Creek Pipeline Project WBI Energy Transmission Lateral Completed 30/10/2019
+
• Demicks Lake-Cherry Creek Pipeline Project WBI Energy Transmission Lateral Completed 30/10/2019
−
Eastern Market Access Project Dominion Cove Point LNG PL Co Expansion Completed 30/08/2019
+
• Eastern Market Access Project Dominion Cove Point LNG PL Co Expansion Completed 30/08/2019
−
Eastern Shore 2017 Expansion Eastern Shore Natural Gas Expansion Completed 10/10/2019
+
• Eastern Shore 2017 Expansion Eastern Shore Natural Gas Expansion Completed 10/10/2019
−
Eastern System Upgrade Project Millennium Pipeline Expansion Completed 19/03/2019
+
• Eastern System Upgrade Project Millennium Pipeline Expansion Completed 19/03/2019
−
East-West Project Florida Gas Trans Co Lateral Completed 22/01/2019
+
• East-West Project Florida Gas Trans Co Lateral Completed 22/01/2019
−
Equitrans Expansion Project Equitrans Expansion Completed 30/07/2019
+
• Equitrans Expansion Project Equitrans Expansion Completed 30/07/2019
−
Gulf Coast Express DCP Midstream, Targa Resources Corp. New Pipeline Completed 25/09/2019
+
• Gulf Coast Express DCP Midstream, Targa Resources Corp. New Pipeline Completed 25/09/2019
−
Gulf Connector Expansion Project Transcontinental Gas Pipeline Reversal Completed 01/01/2019
+
• Gulf Connector Expansion Project Transcontinental Gas Pipeline Reversal Completed 01/01/2019
−
Gulf Xpress Columbia Gulf Transmission Reversal Completed 14/06/2019
+
• Gulf Xpress Columbia Gulf Transmission Reversal Completed 14/06/2019
−
High Plains Kiowa Lateral Expanson Project Colorado Interstate Gas Co Expansion Completed 22/07/2019
+
• High Plains Kiowa Lateral Expanson Project Colorado Interstate Gas Co Expansion Completed 22/07/2019
−
Lambertville East Expansion Project Texas Eastern Transmission Expansion Completed 07/11/2019
+
• Lambertville East Expansion Project Texas Eastern Transmission Expansion Completed 07/11/2019
−
Line KNYS Uprate Project National Fuel Gas Supply Corp Expansion Completed 12/12/2019
+
• Line KNYS Uprate Project National Fuel Gas Supply Corp Expansion Completed 12/12/2019
−
Line N to Monaca Project National Fuel Gas Supply Corp Lateral Completed 12/11/2019
+
• Line N to Monaca Project National Fuel Gas Supply Corp Lateral Completed 12/11/2019
−
Marquette Branch Line Expansion Project Northwest Natural Gas Co Expansion Completed 11/10/2019
+
• Marquette Branch Line Expansion Project Northwest Natural Gas Co Expansion Completed 11/10/2019
−
Mountaineer XPress Pipeline (TCO Pool) Columbia Gas Transmission Expansion Completed 01/03/2019
+
• Mountaineer XPress Pipeline (TCO Pool) Columbia Gas Transmission Expansion Completed 01/03/2019
−
Mountaineer XPress Pipeline (to CGT) Columbia Gas Transmission Expansion Completed 01/03/2019
+
• Mountaineer XPress Pipeline (to CGT) Columbia Gas Transmission Expansion Completed 01/03/2019
−
Natural Bridge Pipeline Black Hills Gas Distribution LLC New Pipeline Completed 02/12/2019
+
• Natural Bridge Pipeline Black Hills Gas Distribution LLC New Pipeline Completed 02/12/2019
−
North Mist Expansion Project Northwest Natural Gas Co New Pipeline Completed 31/05/2019
+
• North Mist Expansion Project Northwest Natural Gas Co New Pipeline Completed 31/05/2019
−
North Seattle Lateral Upgrade Project Northwest Pipeline Co Expansion Completed 14/11/2019
+
• North Seattle Lateral Upgrade Project Northwest Pipeline Co Expansion Completed 14/11/2019
−
North Texas Pipeline Expansion/Old Ocean Pipeline Enterprise, Energy Transfer Partners Expansion Completed 15/01/2019
+
• North Texas Pipeline Expansion/Old Ocean Pipeline Enterprise, Energy Transfer Partners Expansion Completed 15/01/2019
−
Northern Lights 2019 Northern Natural Gas Co New Pipeline Completed 18/10/2019
+
• Northern Lights 2019 Northern Natural Gas Co New Pipeline Completed 18/10/2019
−
ONEOK Eastbound Expansion ONEOK Inc. Expansion Completed 01/02/2019
+
• ONEOK Eastbound Expansion ONEOK Inc. Expansion Completed 01/02/2019
−
ONEOK Westbound Expansion ONEOK Inc. Expansion Completed 01/02/2019
+
• ONEOK Westbound Expansion ONEOK Inc. Expansion Completed 01/02/2019
−
ONEOK WestTex Expansion ONEOK Inc. Expansion Completed 01/02/2019
+
• ONEOK WestTex Expansion ONEOK Inc. Expansion Completed 01/02/2019
−
Portland Xpress Project Phase 2 Portland Natural Gas Transmission System Expansion Completed 21/02/2019
+
• Portland Xpress Project Phase 2 Portland Natural Gas Transmission System Expansion Completed 21/02/2019
−
Red Bluff Express Extension Energy Transfer Co Expansion Completed 31/08/2019
+
• Red Bluff Express Extension Energy Transfer Co Expansion Completed 31/08/2019
−
Risberg Line RH energytrans LLC New Pipeline Completed 22/11/2019
+
• Risberg Line RH energytrans LLC New Pipeline Completed 22/11/2019
−
Rivervale South to Market Project Transcontinental Gas Pipeline Expansion Completed 03/09/2019
+
• Rivervale South to Market Project Transcontinental Gas Pipeline Expansion Completed 03/09/2019
−
Roadrunner Eastbound Project ONEOK Inc. Reversal Completed 01/02/2019
+
• Roadrunner Eastbound Project ONEOK Inc. Reversal Completed 01/02/2019
−
Rochester Expansion Project Northern Natural Gas Co Lateral Completed 05/12/2019
+
• Rochester Expansion Project Northern Natural Gas Co Lateral Completed 05/12/2019
−
Sanford Project Florida Gas Trans Co Expansion Completed 01/08/2019
+
• Sanford Project Florida Gas Trans Co Expansion Completed 01/08/2019
−
Southside Connector Distribution Project Virginia Natural Gas New Pipeline Completed 01/03/2019
+
• Southside Connector Distribution Project Virginia Natural Gas New Pipeline Completed 01/03/2019
−
Spire St. Louis Pipeline (Laclede Lateral) Spire STL Pipeline LLC New Pipeline Completed 14/11/2019
+
• Spire St. Louis Pipeline (Laclede Lateral) Spire STL Pipeline LLC New Pipeline Completed 14/11/2019
−
St. James Supply Project Transcontinental Gas Pipeline Lateral Completed 02/04/2019
+
• St. James Supply Project Transcontinental Gas Pipeline Lateral Completed 02/04/2019
−
Stratton Ridge Expansion Texas Eastern Transmission Expansion Completed 22/03/2019
+
• Stratton Ridge Expansion Texas Eastern Transmission Expansion Completed 22/03/2019
−
Texas-Louisiana Markets Project Texas Eastern Transmission Expansion Completed 31/05/2019
+
• Texas-Louisiana Markets Project Texas Eastern Transmission Expansion Completed 31/05/2019
−
Transwestern Lea County Expansion Transwestern Pipeline Co Expansion Completed 24/04/2019
+
• Transwestern Lea County Expansion Transwestern Pipeline Co Expansion Completed 24/04/2019
−
Valley Crossing Pipeline (Nueces - Brownsville) Enbridge Energy Pipeline Co New Pipeline Completed 07/02/2019
+
• Valley Crossing Pipeline (Nueces - Brownsville) Enbridge Energy Pipeline Co New Pipeline Completed 07/02/2019
−
Westbrook Xpress Project Phase 1 Portland Natural Gas Transmission System Expansion Completed 09/07/2019
+
• Westbrook Xpress Project Phase 1 Portland Natural Gas Transmission System Expansion Completed 09/07/2019
−
Westlake Expansion Project Gulf South Pipeline Lateral Completed 09/08/2019
+
• Westlake Expansion Project Gulf South Pipeline Lateral Completed 09/08/2019
−
Alabama Compressor Station Upgrade AlaTenn Pipeline Expansion Completed 08/10/2020
+
• Alabama Compressor Station Upgrade AlaTenn Pipeline Expansion Completed 08/10/2020
−
Buckeye Xpress Columbia Gas Transmission Expansion Completed 21/12/2020
+
• Buckeye Xpress Columbia Gas Transmission Expansion Completed 21/12/2020
−
Cheniere MIDSHIP Pipeline Project Cheniere MIDSHIP Pipeline New Pipeline Completed 16/04/2020
+
• Cheniere MIDSHIP Pipeline Project Cheniere MIDSHIP Pipeline New Pipeline Completed 16/04/2020
−
Cheyenne Connector Pipeline Tallgrass Energy Partners LP Expansion Completed 24/06/2020
+
• Cheyenne Connector Pipeline Tallgrass Energy Partners LP Expansion Completed 24/06/2020
−
Cheyenne Hub Enhancement Project Rockies Express Pipeline Expansion Completed 24/06/2020
+
• Cheyenne Hub Enhancement Project Rockies Express Pipeline Expansion Completed 24/06/2020
−
DTE LEAP Project DTE New Pipeline Completed 01/08/2020
+
• DTE LEAP Project DTE New Pipeline Completed 01/08/2020
−
East Louisiana Project Florida Gas Trans Co Expansion Completed 07/04/2020
+
• East Louisiana Project Florida Gas Trans Co Expansion Completed 07/04/2020
−
Empire North Expansion Project Empire Pipeline Expansion Completed 26/06/2020
+
• Empire North Expansion Project Empire Pipeline Expansion Completed 26/06/2020
−
Gateway Expansion Project Transcontinental Gas Pipeline Expansion Completed 22/11/2019
+
• Gateway Expansion Project Transcontinental Gas Pipeline Expansion Completed 22/11/2019
−
Hammerhead Pipeline Equitrans Midstream Corporation New Pipeline Completed 01/08/2020
+
• Hammerhead Pipeline Equitrans Midstream Corporation New Pipeline Completed 01/08/2020
−
Hillabee Expansion phase 2 Transcontinental Gas Pipeline Expansion Completed 13/04/2020
+
• Hillabee Expansion phase 2 Transcontinental Gas Pipeline Expansion Completed 13/04/2020
−
Index 99 Expansion Project Gulf South Pipeline New Pipeline Completed 25/08/2020
+
• Index 99 Expansion Project Gulf South Pipeline New Pipeline Completed 25/08/2020
−
Lakeshore Capacity Improvement Project (PCIP) Wisconsin Electric Gas Operations (WEGO) Lateral Completed 21/08/2020
+
• Lakeshore Capacity Improvement Project (PCIP) Wisconsin Electric Gas Operations (WEGO) Lateral Completed 21/08/2020
−
Leidy North Project Dominion Energy Transmission Co Expansion Completed 18/08/2020
+
• Leidy North Project Dominion Energy Transmission Co Expansion Completed 18/08/2020
−
Line DT and DS Replacement Project Southern Star Central Gas Pipeline Upgrade Completed 23/11/2020
+
• Line DT and DS Replacement Project Southern Star Central Gas Pipeline Upgrade Completed 23/11/2020
−
Line OT-27 Project Enable Gas Transmission Lateral Completed 01/01/2020
+
• Line OT-27 Project Enable Gas Transmission Lateral Completed 01/01/2020
−
Lockridge Extension Pipeline Nat Gas P L Co of America Expansion Completed 28/09/2020
+
• Lockridge Extension Pipeline Nat Gas P L Co of America Expansion Completed 28/09/2020
−
New Lisbon 2020 Expansion Project Northern Natural Gas Co Expansion Completed 29/10/2020
+
• New Lisbon 2020 Expansion Project Northern Natural Gas Co Expansion Completed 29/10/2020
−
Northern Delaware Basin Expansion Project El Paso Natural Gas Expansion Completed 01/02/2020
+
• Northern Delaware Basin Expansion Project El Paso Natural Gas Expansion Completed 01/02/2020
−
Portland Xpress Project Phase 3 Portland Natural Gas Transmission System Expansion Completed 28/10/2020
+
• Portland Xpress Project Phase 3 Portland Natural Gas Transmission System Expansion Completed 28/10/2020
−
Rover Expansion Project Rover Pipeline Expansion Completed 20/04/2020
+
• Rover Expansion Project Rover Pipeline Expansion Completed 20/04/2020
−
Sabal Trail Project Phase II Spectra Energy Corp/NextEra Energy/Duke Energy Expansion Completed 22/04/2020
+
• Sabal Trail Project Phase II Spectra Energy Corp/NextEra Energy/Duke Energy Expansion Completed 22/04/2020
−
Sabine Pass Compression Project Nat Gas P L Co of America Expansion Completed 01/10/2020
+
• Sabine Pass Compression Project Nat Gas P L Co of America Expansion Completed 01/10/2020
−
Saginaw Trail Pipeline Consumers Energy Co. New Pipeline Completed 23/11/2020
+
• Saginaw Trail Pipeline Consumers Energy Co. New Pipeline Completed 23/11/2020
−
Sendero Carlsbad Gateway Project Sendero Carlsbad Gateway LLC New Pipeline Completed 04/05/2020
+
• Sendero Carlsbad Gateway Project Sendero Carlsbad Gateway LLC New Pipeline Completed 04/05/2020
−
Sierrita Pima Expansion Sierrita Gas Pipeline Expansion Completed 31/03/2020
+
• Sierrita Pima Expansion Sierrita Gas Pipeline Expansion Completed 31/03/2020
−
South Mainline Expansion Project El Paso Natural Gas Expansion Completed 02/07/2020
+
• South Mainline Expansion Project El Paso Natural Gas Expansion Completed 02/07/2020
−
Tri-West Project Dominion Energy Transmission Co Expansion Completed 28/08/2020
+
• Tri-West Project Dominion Energy Transmission Co Expansion Completed 28/08/2020
−
VNG Suffolk No. 3 Meter Station Expansion Project Columbia Gas Transmission Expansion Completed 06/10/2020
+
• VNG Suffolk No. 3 Meter Station Expansion Project Columbia Gas Transmission Expansion Completed 06/10/2020
−
Wamsutter West Expansion Dominion Energy Overthrust Pipeline Expansion Completed 01/11/2020
+
• Wamsutter West Expansion Dominion Energy Overthrust Pipeline Expansion Completed 01/11/2020
−
Wick Meter Station Project Rover Pipeline Expansion Completed 15/07/2020
+
• Wick Meter Station Project Rover Pipeline Expansion Completed 15/07/2020
−
Willis Lateral Project Gulf South Pipeline Lateral Completed 29/05/2020
+
• Willis Lateral Project Gulf South Pipeline Lateral Completed 29/05/2020
−
134th Street Lateral Project Nat Gas P L Co of America Lateral Completed 20/08/2021
+
• 134th Street Lateral Project Nat Gas P L Co of America Lateral Completed 20/08/2021
−
2021 Auburn A-line Abandonment and Capacity Replacement Project Northern Natural Gas Co Upgrade Completed 11/08/2021
+
• 2021 Auburn A-line Abandonment and Capacity Replacement Project Northern Natural Gas Co Upgrade Completed 11/08/2021
−
261 Upgrade Projects Tennessee Gas Pipeline Co Expansion Completed 06/10/2021
+
• 261 Upgrade Projects Tennessee Gas Pipeline Co Expansion Completed 06/10/2021
−
AGL International Paper Pipeline Atlanta Gas Light Lateral Completed 31/08/2021
+
• AGL International Paper Pipeline Atlanta Gas Light Lateral Completed 31/08/2021
−
Agua Blanca Expansion Project WhiteWater Expansion Completed 27/01/2021
+
• Agua Blanca Expansion Project WhiteWater Expansion Completed 27/01/2021
−
Appalachia to Market Project Texas Eastern Transmission Conversion Completed 01/11/2021
+
• Appalachia to Market Project Texas Eastern Transmission Conversion Completed 01/11/2021
−
Atlantic Bridge Project Phase 2 Algonquin Gas Transmission Expansion Completed 25/01/2021
+
• Atlantic Bridge Project Phase 2 Algonquin Gas Transmission Expansion Completed 25/01/2021
−
Atlantic Bridge Project Phase 2 (CAN) Maritimes & Northeast Pipeline Expansion Completed 25/01/2021
+
• Atlantic Bridge Project Phase 2 (CAN) Maritimes & Northeast Pipeline Expansion Completed 25/01/2021
−
Bernville Compression Station Project Texas Eastern Transmission Upgrade Completed 03/11/2021
+
• Bernville Compression Station Project Texas Eastern Transmission Upgrade Completed 03/11/2021
−
Blue Water Energy Center (BWEC) Pipeline Vector Pipeline Lateral Completed 15/12/2021
+
• Blue Water Energy Center (BWEC) Pipeline Vector Pipeline Lateral Completed 15/12/2021
−
Bluewater Compressor Project Bluewater Gas Storage Expansion Completed 19/11/2021
+
• Bluewater Compressor Project Bluewater Gas Storage Expansion Completed 19/11/2021
−
Cameron Extension Project Texas Eastern Transmission Expansion Completed 09/12/2021
+
• Cameron Extension Project Texas Eastern Transmission Expansion Completed 09/12/2021
−
Carlsbad South Project El Paso Natural Gas Expansion Completed 28/02/2021
+
• Carlsbad South Project El Paso Natural Gas Expansion Completed 28/02/2021
−
CJ Express Pipeline Midcoast Energy New Pipeline Completed 30/03/2021
+
• CJ Express Pipeline Midcoast Energy New Pipeline Completed 30/03/2021
−
Del-Mar Energy Pathway Project Eastern Shore Natural Gas Expansion Completed 22/09/2021
+
• Del-Mar Energy Pathway Project Eastern Shore Natural Gas Expansion Completed 22/09/2021
−
Double E Pipeline Summit Midstream Partners New Pipeline Completed 17/11/2021
+
• Double E Pipeline Summit Midstream Partners New Pipeline Completed 17/11/2021
−
FM 100 Project National Fuel Gas Supply Corp Expansion Completed 01/12/2021
+
• FM 100 Project National Fuel Gas Supply Corp Expansion Completed 01/12/2021
−
Galveston County Project Florida Gas Trans Co Lateral Completed 01/02/2021
+
• Galveston County Project Florida Gas Trans Co Lateral Completed 01/02/2021
−
Gillis Lateral Enterprise Products Partners Lateral Completed 01/12/2021
+
• Gillis Lateral Enterprise Products Partners Lateral Completed 01/12/2021
−
Lakeshore Lateral Project (LLP) Wisconsin Electric Gas Operations (WEGO) Lateral Completed 07/10/2021
+
• Lakeshore Lateral Project (LLP) Wisconsin Electric Gas Operations (WEGO) Lateral Completed 07/10/2021
−
Lamar County Expansion Project Gulf South Pipeline Lateral Completed 15/12/2021
+
• Lamar County Expansion Project Gulf South Pipeline Lateral Completed 15/12/2021
−
Leidy South Project Transcontinental Gas Pipeline Expansion Completed 15/12/2021
+
• Leidy South Project Transcontinental Gas Pipeline Expansion Completed 15/12/2021
−
Line Section 22 Project WBI Energy Transmission Expansion Completed 31/08/2021
+
• Line Section 22 Project WBI Energy Transmission Expansion Completed 31/08/2021
−
Line SM-116 Forced Relocation Project TC Energy Upgrade Completed 26/08/2021
+
• Line SM-116 Forced Relocation Project TC Energy Upgrade Completed 26/08/2021
−
Mainline 300 Replacement Project Columbia Gulf Transmission Upgrade Completed 29/07/2021
+
• Mainline 300 Replacement Project Columbia Gulf Transmission Upgrade Completed 29/07/2021
−
MASS Project Enable Gas Transmission Expansion Completed 01/04/2021
+
• MASS Project Enable Gas Transmission Expansion Completed 01/04/2021
−
McComb Compressor Station Reliability Project Gulf South Pipeline Expansion Completed 01/03/2021
+
• McComb Compressor Station Reliability Project Gulf South Pipeline Expansion Completed 01/03/2021
−
Middlesex Expansion Project Texas Eastern Transmission Expansion Completed 28/09/2021
+
• Middlesex Expansion Project Texas Eastern Transmission Expansion Completed 28/09/2021
−
NGPL Gulf Coast Southbound Project (Phase II) Nat Gas P L Co of America Reversal Completed 01/03/2021
+
• NGPL Gulf Coast Southbound Project (Phase II) Nat Gas P L Co of America Reversal Completed 01/03/2021
−
Permian Highway Pipeline Project Kinder Morgan Energy Partners New Pipeline Completed 01/01/2021
+
• Permian Highway Pipeline Project Kinder Morgan Energy Partners New Pipeline Completed 01/01/2021
−
Point of Rocks West Expansion Project Overthrust Pipeline Expansion Completed 31/12/2021
+
• Point of Rocks West Expansion Project Overthrust Pipeline Expansion Completed 31/12/2021
−
Santa Fe Mainline New Mexico Gas Expansion Completed 26/02/2021
+
• Santa Fe Mainline New Mexico Gas Expansion Completed 26/02/2021
−
Southeastern Trail Expansion Project Transcontinental Gas Pipeline Expansion Completed 01/03/2021
+
• Southeastern Trail Expansion Project Transcontinental Gas Pipeline Expansion Completed 01/03/2021
−
Trail County Pipeline Dakota Natural Gas, LLC Expansion Completed 05/08/2021
+
• Trail County Pipeline Dakota Natural Gas, LLC Expansion Completed 05/08/2021
−
TransCameron Pipeline TransCameron Pipeline LLC/Venture Global Calcasieu Pass Lateral Completed 07/04/2021
+
• TransCameron Pipeline TransCameron Pipeline LLC/Venture Global Calcasieu Pass Lateral Completed 07/04/2021
−
Tuscarora Xpress Project TC Energy Expansion Completed 08/11/2021
+
• Tuscarora Xpress Project TC Energy Expansion Completed 08/11/2021
−
Valentine Chemicals Interconnect Project Gulf South Pipeline Lateral Completed 06/07/2021
+
• Valentine Chemicals Interconnect Project Gulf South Pipeline Lateral Completed 06/07/2021
−
West Loop Project Dominion Energy Transmission Co Expansion Completed 09/06/2021
+
• West Loop Project Dominion Energy Transmission Co Expansion Completed 09/06/2021
−
Westbrook Xpress Project Phase 2 Portland Natural Gas Transmission System Expansion Completed 21/10/2021
+
• Westbrook Xpress Project Phase 2 Portland Natural Gas Transmission System Expansion Completed 21/10/2021
−
Westbrook Xpress Project Phase 3 Portland Natural Gas Transmission System Expansion Completed 21/10/2021
+
• Westbrook Xpress Project Phase 3 Portland Natural Gas Transmission System Expansion Completed 21/10/2021
−
Whistler Pipeline Project WhiteWater New Pipeline Completed 01/07/2021
+
• Whistler Pipeline Project WhiteWater New Pipeline Completed 01/07/2021
−
Acadiana Project Kinder Morgan Energy Partners Expansion Completed 01/10/2022
+
• Acadiana Project Kinder Morgan Energy Partners Expansion Completed 01/10/2022
−
Bailey East Mine Panel 11J Project Texas Eastern Transmission Upgrade Completed 29/11/2022
+
• Bailey East Mine Panel 11J Project Texas Eastern Transmission Upgrade Completed 29/11/2022
−
Central Corridor Pipeline Extension Duke Energy Ohio Expansion Completed 14/03/2022
+
• Central Corridor Pipeline Extension Duke Energy Ohio Expansion Completed 14/03/2022
−
Grand Chenier XPress Project ANR Pipeline Expansion Completed 12/11/2021
+
• Grand Chenier XPress Project ANR Pipeline Expansion Completed 12/11/2021
−
Greene Interconnect Project Mountain Valley Pipeline, LLC Expansion Completed 30/09/2022
+
• Greene Interconnect Project Mountain Valley Pipeline, LLC Expansion Completed 30/09/2022
−
Gulf Run Pipeline Enable Gas Transmission New Pipeline Completed 14/12/2022
+
• Gulf Run Pipeline Enable Gas Transmission New Pipeline Completed 14/12/2022
−
Gulfstream Phase VI Expansion Project Gulfstream Natural Gas System LLC Expansion Completed 12/07/2022
+
• Gulfstream Phase VI Expansion Project Gulfstream Natural Gas System LLC Expansion Completed 12/07/2022
−
L-722 Replacement Project Columbia Gas Upgrade Completed 17/11/2022
+
• L-722 Replacement Project Columbia Gas Upgrade Completed 17/11/2022
−
Louisiana XPress Project Columbia Gulf Transmission Expansion Completed 21/09/2022
+
• Louisiana XPress Project Columbia Gulf Transmission Expansion Completed 21/09/2022
−
Lowman Pipeline NextEra Energy Lateral Completed 31/07/2022
+
• Lowman Pipeline NextEra Energy Lateral Completed 31/07/2022
−
Marshall County Mine Panels 19E and 20E Projects Texas Eastern Transmission Upgrade Completed 26/10/2022
+
• Marshall County Mine Panels 19E and 20E Projects Texas Eastern Transmission Upgrade Completed 26/10/2022
−
Mobile County Project Florida Gas Trans Co Expansion Completed 31/01/2022
+
• Mobile County Project Florida Gas Trans Co Expansion Completed 31/01/2022
−
Moore-Dorchester Optimization Project Carolina Gas Transmission Expansion Completed 30/09/2022
+
• Moore-Dorchester Optimization Project Carolina Gas Transmission Expansion Completed 30/09/2022
−
Niles Power Plant Meter Station Project ANR Pipeline Lateral Completed 13/07/2022
+
• Niles Power Plant Meter Station Project ANR Pipeline Lateral Completed 13/07/2022
−
North Bakken Expansion Project MDU Resources Group New Pipeline Completed 26/01/2022
+
• North Bakken Expansion Project MDU Resources Group New Pipeline Completed 26/01/2022
−
Northern Lights 2021 Expansion Northern Natural Gas Co Expansion Completed 13/12/2022
+
• Northern Lights 2021 Expansion Northern Natural Gas Co Expansion Completed 13/12/2022
−
Putnam Expansion Project Florida Gas Trans Co Expansion Completed 25/02/2022
+
• Putnam Expansion Project Florida Gas Trans Co Expansion Completed 25/02/2022
−
Rover - North Coast Interconnect Project Rover Pipeline Lateral Completed 16/12/2022
+
• Rover - North Coast Interconnect Project Rover Pipeline Lateral Completed 16/12/2022
−
Rover–Brightmark Receipt and Delivery Meter Station Project Rover Pipeline Lateral Completed 02/10/2022
+
• Rover–Brightmark Receipt and Delivery Meter Station Project Rover Pipeline Lateral Completed 02/10/2022
−
Southwest Alabama Project Florida Gas Trans Co Expansion Completed 12/01/2022
+
• Southwest Alabama Project Florida Gas Trans Co Expansion Completed 12/01/2022
−
Wisconsin Access Project ANR Pipeline Expansion Completed 01/11/2022
+
• Wisconsin Access Project ANR Pipeline Expansion Completed 01/11/2022
−
Yorktown Meter Station Upgrade Algonquin Gas Transmission Expansion Completed 10/03/2022
+
• Yorktown Meter Station Upgrade Algonquin Gas Transmission Expansion Completed 10/03/2022

Revision as of 17:43, 20 September 2023

• (SEML) Southeast Mainline System Reversal ANR Pipeline Reversal Completed 01/12/2015 • 2015 Elko Area Expansion Project Paiute Pipeline Lateral Completed 07/10/2015 • Broad Run Flexibility Project Tennessee Gas Pipeline Co Reversal Completed 01/11/2015 • Carty Lateral Project Gas Transmission Northwest Lateral Completed 04/11/2015 • Creole Trail Expansion Project 1 Cheniere Creole Trail Pipeline Reversal Completed 27/04/2015 • East Side Expansion Project Columbia Pipeline Expansion Completed 30/10/2015 • East Side Expansion Project Columbia Gas Transmission Expansion Completed 30/09/2015 • Edgemoor Compressor Station Dominion Carolina Gas Transmission Expansion Completed 01/12/2015 • Edinburg Lateral Houston Pipe Line Expansion Completed 08/06/2015 • Junction Platform Project Discovery Gas Transmission LLC New Pipeline Completed 07/02/2015 • Kingsport Expansion East Tennessee Nat Gas Co Expansion Completed 01/01/2015 • Lebanon lateral project ANR Pipeline Reversal Completed 01/05/2015 • Leidy Southeast Expansion Transcontinental Gas Pipeline Expansion Completed 05/01/2016 • Line N West Side Expansion and Modernization Project NiSource Gas Transmission & Storage Expansion Completed 24/09/2015 • Mobile Bay South III Expansion Project Transcontinental Gas Pipeline Expansion Completed 27/03/2015 • Niagara Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/10/2015 • Northern Access 2015 Project National Fuel Gas Supply Corp Expansion Completed 03/12/2015 • Ohio Pipeline Energy Network Texas Eastern Transmission Reversal Completed 01/12/2015 • SESH Expansion Project Southeast Supply Header LLC Expansion Completed 12/11/2015 • Sulphur Springs Compression Project ANR Pipeline Expansion Completed 22/10/2015 • Transco Rockaway Delivery Project Transcontinental Gas Pipeline New Pipeline Completed 14/05/2015 • Tuscarora Lateral Project Empire Pipeline Lateral Completed 04/11/2015 • Uniontown to Gas City Expansion Project (U2GC) (bi-directional) Texas Eastern Transmission Reversal Completed 28/08/2015 • Virginia Southside Expansion Transcontinental Gas Pipeline Expansion Completed 27/08/2015 • West Leg 2015 Expansion Northern Natural Gas Co Expansion Completed 31/10/2015 • Woodbridge lateral Transcontinental Gas Pipeline Lateral Completed 26/03/2015 • Zone 3 East-to-West Project Rockies Express Pipeline Reversal Completed 01/09/2015 • Algonquin Incremental Market (AIM) Algonquin Gas Transmission Expansion Completed 30/12/2016 • Chicago Market Expansion Project Phase 1 Nat Gas P L Co of America Expansion Completed 01/11/2016 • Clarington Project Dominion Transmission Expansion Completed 19/10/2016 • Columbia to Eastover Pipeline Dominion Carolina Gas Transmission New Pipeline Completed 01/11/2016 • Columbia to Eastover Pipeline Dominion Carolina Gas Transmission New Pipeline Construction • Creole Trail Expansion Project 2 Cheniere Creole Trail Pipeline Reversal Approved • EEC Modification Project Elba Express Co Expansion Construction • Gulf Markets Expansion Phase 1 (bi-directional) Texas Eastern Transmission Reversal Completed 04/10/2016 • Lebanon West II Dominion Transmission Expansion Completed 01/11/2016 • Loudon Expansion Project East Tennessee Nat Gas Co Expansion Completed 01/09/2016 • Malaga Lateral Project Transwestern Pipeline Co Lateral Completed 17/04/2016 • Ohio Valley Connector Equitrans Expansion Completed 01/10/2016 • Ohio-Louisiana Access project Texas Gas Transmission Reversal Completed 27/05/2016 • Pipeline Zone 3 Capacity Enhancement Rockies Express Pipeline Reversal Completed 30/12/2016 • Roadrunner Gas Transmission phase 1 Roadrunner Gas Transmission New Pipeline Completed 10/03/2016 • Roadrunner Gas Transmission phase 2 Roadrunner Gas Transmission Expansion Completed 01/10/2016 • Rock Springs Expansion Transcontinental Gas Pipeline Lateral Completed 01/08/2016 • Salem Lateral Project Algonquin Gas Transmission Lateral Completed 30/11/2016 • Silo Pipeline Project Kaiser-Frontier Midstream Lateral Completed 23/06/2016 • Southern Indiana Market Project Texas Gas Transmission Lateral Completed 17/06/2016 • St. Charles Project Dominion Cove Point LNG PL Co Expansion Completed 27/05/2016 • TETCO Capacity Expansion Project Eastern Shore Natural Gas Expansion Completed 01/07/2016 • TETCO Capacity Expansion Project Eastern Shore Natural Gas Expansion Applied • Utica Access Project Columbia Gas Transmission Lateral Completed 30/09/2016 • Western Kentucky Lateral Project Texas Gas Transmission Lateral Completed 26/08/2016 • WesTex Expansion ONEOK WesTex Pipeline Expansion Completed 01/10/2016 • Zone 3 Expansion Southern Natural Gas Co Expansion Completed 02/09/2016 • Access South Project Texas Eastern Transmission Reversal Completed 31/10/2017 • Adair Southwest Project Texas Eastern Transmission Reversal Completed 31/10/2017 • ANR Collierville Expansion Project ANR Pipeline Expansion Completed 14/11/2017 • Atlantic Bridge project Phase 1 Algonquin Gas Transmission Expansion Completed 01/11/2017 • Atlantic Sunrise Project Phase IA Transcontinental Gas Pipeline Reversal Completed • Cameron Pipeline Expansion Sempra LNG Reversal Completed 28/03/2017 • Canton Pipeline SemGroup Corp New Pipeline Completed 01/12/2017 • Comanche Trail Pipeline Comanche Trail Pipeline LLC New Pipeline Completed 30/01/2017 • Connecticut Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017 • Dominion Keys Energy Center Dominion Cove Point LNG PL Co Expansion Completed 01/03/2017 • Florida Southeast Connection NextEra Energy New Pipeline Completed 12/06/2017 • Gaines County Crossover Compressor Station Northern Natural Gas Co Expansion Completed 01/06/2017 • Garden State Expansion Phase 1 Transcontinental Gas PipeLine Expansion Completed 09/09/2017 • Gulf Markets Expansion Phase 2 (bi-directional) Texas Eastern Transmission Reversal Completed 01/08/2017 • Gulf Trace Expansion Project Transcontinental Gas Pipeline Lateral Completed 01/01/2017 • Hillabee Expansion phase 1 Transcontinental Gas Pipeline Expansion Completed 07/06/2017 • Impulsora Pipeline Nueva Era Pipeline New Pipeline Completed 01/12/2017 • Jacksonville Expansion Project Florida Gas Trans Co Expansion Completed 01/06/2017 • Keys Energy Project Dominion Cove Point LNG PL Co Expansion Completed 21/03/2017 • Lebanon Extension Project Texas Eastern Transmission Reversal Completed 26/07/2017 • Leidy South Project Dominion Transmission Expansion Completed 27/09/2017 • Natchez Pipeline Project (Midla) American Midstream (MidLa) New Pipeline Completed 29/03/2017 • Nautilus Gas Gathering System Crestwood Permian Basin New Pipeline Completed 01/06/2017 • New Market Project Dominion Transmission Expansion Completed 01/11/2017 • New York Bay Expansion Project Transcontinental Gas Pipeline Expansion Completed 06/10/2017 • Northern Lights 2017 Expansion Northern Natural Gas Co Expansion Completed 01/11/2017 • Northern Supply Access Project Texas Gas Transmission Reversal Completed 02/03/2017 • Orion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017 • Panhandle Backhaul Project Panhandle Eastern Pipeline Co Reversal Completed 31/08/2017 • PNGTS C2C Expansion Project Portland Natural Gas Transmission System Expansion Completed 01/12/2017 • Rayne XPress Project Columbia Gulf Transmission Reversal Completed 01/12/2017 • Rover Pipeline Project Phase 1 ET Rover Pipeline New Pipeline Completed 01/09/2017 • Sabal Trail Project Phase I Spectra Energy Corp/NextEra Energy/Duke Energy New Pipeline Completed 07/06/2017 • Susquehanna West Project Tennessee Gas Pipeline Co Reversal Completed 30/08/2017 • System Reliability Project Eastern Shore Natural Gas Expansion Completed 15/06/2017 • Transco Dalton Expansion Project Transcontinental Gas Pipeline Lateral Completed 01/04/2017 • Trans-Pecos Pipeline Trans-Pecos Pipeline LLC New Pipeline Completed 31/03/2017 • Triad Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/11/2017 • Trunkline Backhaul Project Trunkline Gas Co Reversal Completed 31/08/2017 • UGI Sunbury Pipeline UGI Energy Services Lateral Completed 03/01/2017 • Virginia Southside Expansion Project II Transcontinental Gas Pipeline Lateral Completed 04/12/2017 • White Oak Mainline Expansion Project Eastern Shore Natural Gas Expansion Completed 10/03/2017 • 2018 Paiute Expansion Project Paiute Pipeline Expansion Completed 04/12/2018 • Agua Blanca Pipeline WhiteWater New Pipeline Completed 01/04/2018 • Allen Compressor Station Modification Project Enable Gas Transmission Expansion Completed 25/09/2018 • Appalachian Lease Project (TEAL) Phase 1 Texas Eastern Transmission Lateral Completed 09/11/2018 • Atlantic Sunrise Project Phase 1B Transcontinental Gas Pipeline Reversal Completed 01/06/2018 • Atlantic Sunrise Project Phase II Transcontinental Gas Pipeline Reversal Completed 04/10/2018 • Bakken Line 27 Expansion MDU Resources Group Expansion Completed 15/09/2018 • Bayway Lateral Project Texas Eastern Transmission Lateral Completed 03/01/2018 • Birdsboro Pipeline Project DTE Midstream Appalachia, LLC New Pipeline Completed 10/12/2018 • Blue Mountain Chisholm Trail Project Southern Star Central Gas Pipeline Lateral Completed 09/06/2018 • Broad Run Expansion Project Tennessee Gas Pipeline Co Expansion Completed 01/06/2018 • Bushy Park Extension Project Dominion Energy Carolina Gas Expansion Completed 09/12/2018 • Cameron Access Project Columbia Gulf Transmission Reversal Completed 13/03/2018 • Cana STACK Expansion Project Enable Gas Transmission Expansion Completed 01/10/2018 • Cedar Station Upgrade Project Northern Natural Gas Co Expansion Completed 15/11/2018 • Central Virginia Connector Columbia Gas Transmission New Pipeline Completed 04/09/2018 • Cheniere Corpus Christi Pipeline Project Cheniere Corpus Christi Pipeline New Pipeline Completed 23/05/2018 • Cheyenne Compressor Station Expansion Project Wyoming Interstate Gas Co Expansion Completed 23/05/2018 • Chicago Market Expansion Project Phase 2 Nat Gas P L Co of America Expansion On Hold • CIG 2018 Line Nos. 5A and 5B Expansion Project Colorado Interstate Gas Co Expansion Completed 09/05/2018 • Coastal Bend Header Gulf South Pipeline Lateral Completed 01/04/2018 • CPV Valley lateral project Millennium Pipeline Lateral Completed 09/07/2018 • EEC Modification Project Elba Express Co Expansion Completed 14/11/2018 • Fairburn Expansion Project Southern Natural Gas Co Expansion Completed 12/12/2018 • FGT Western Division Project Florida Gas Trans Co Expansion Completed 25/10/2018 • Fox Energy Center Natural Gas Lateral Project Wisconsin Public Service Corp Lateral Completed 31/10/2018 • Garden State Expansion Phase 2 Transcontinental Gas Pipeline Expansion Completed 16/03/2018 • Impulsora Pipeline Crossing Project Impulsora Pipeline New Pipeline Completed 30/05/2018 • KM Border Pipeline Expansion Kinder Morgan Border Pipeline LLC Expansion Completed 20/02/2018 • Leach XPress project Columbia Gas Transmission Reversal Completed 01/01/2018 • Line YM28 and Line FM120 Modernization Project National Fuel Gas Supply Corp Expansion Completed 22/12/2018 • Lone Star Expansion Tennessee Gas Pipeline Co Expansion Completed 28/11/2018 • NEXUS Gas Transmission Spectra Energy New Pipeline Completed 10/10/2018 • NGPL Gulf Coast Southbound Phase I Nat Gas P L Co of America Reversal Completed 04/10/2018 • Okeechobee Lateral Project Florida Southeast Connection LLC Lateral Completed 30/08/2018 • Permian North Expansion Project El Paso Natural Gas Expansion Completed 05/12/2018 • Pomelo Connector Pipeline Texas Eastern Transmission Expansion Completed 28/11/2018 • Portland Xpress Project Phase 1 (CAN to ME) Portland Natural Gas Transmission System Expansion Completed 01/11/2018 • Portland Xpress Project Phase 1 (ME to MA) Portland Natural Gas Transmission System Expansion Completed 01/11/2018 • Project Wildcat Enable Gas Transmission New Pipeline Completed 01/08/2018 • Red Bluff Express Pipeline Energy Transfer Co New Pipeline Completed 01/05/2018 • Revolution Pipeline Project Energy Transfer Co New Pipeline Completed 28/02/2018 • Rover Pipeline Project Phase 2 ET Rover Pipeline New Pipeline Completed 01/06/2018 • Sabine Pass Expansion Project (formerly Sabine Pass Liquefaction Lateral and Tap) Kinder Morgan Energy Partners Lateral Completed 11/12/2018 • Sooner Trails Project Southern Star Central Gas Pipeline Expansion Cancelled • South Alabama Project Florida Gas Trans Co Expansion Completed 26/11/2018 • South Saskatchewan Access Project Steel Reef Pipelines US LLC New Pipeline Completed 14/12/2018 • South Texas Expansion Project Enbridge Energy Pipeline Co Reversal Completed 28/11/2018 • Southwest Louisiana Supply Project Tennessee Gas Pipeline Co Reversal Completed 09/03/2018 • St. Charles Parish Expansion Project Gulf South Pipeline Expansion Completed 31/10/2018 • TGP Rio Bravo Hidalgo Expansion Tennessee Gas Pipeline Co Expansion Completed 05/07/2018 • Transco to Charleston Project Dominion Carolina Gas Transmission Expansion Completed 27/02/2018 • Valley Expansion Project WBI Energy Transmission Expansion Completed 31/10/2018 • WB (West Bound) Xpress (East) Columbia Gas Transmission Expansion Completed 15/11/2018 • WB (West Bound) Xpress (west) Columbia Gas Transmission Expansion Completed 04/10/2018 • Wisconsin South Expansion Project ANR Pipeline Expansion Completed 11/11/2018 • Appalachian Lease Project (TEAL) Phase 2 Texas Eastern Transmission Lateral Completed 01/04/2019 • Demicks Lake-Cherry Creek Pipeline Project WBI Energy Transmission Lateral Completed 30/10/2019 • Eastern Market Access Project Dominion Cove Point LNG PL Co Expansion Completed 30/08/2019 • Eastern Shore 2017 Expansion Eastern Shore Natural Gas Expansion Completed 10/10/2019 • Eastern System Upgrade Project Millennium Pipeline Expansion Completed 19/03/2019 • East-West Project Florida Gas Trans Co Lateral Completed 22/01/2019 • Equitrans Expansion Project Equitrans Expansion Completed 30/07/2019 • Gulf Coast Express DCP Midstream, Targa Resources Corp. New Pipeline Completed 25/09/2019 • Gulf Connector Expansion Project Transcontinental Gas Pipeline Reversal Completed 01/01/2019 • Gulf Xpress Columbia Gulf Transmission Reversal Completed 14/06/2019 • High Plains Kiowa Lateral Expanson Project Colorado Interstate Gas Co Expansion Completed 22/07/2019 • Lambertville East Expansion Project Texas Eastern Transmission Expansion Completed 07/11/2019 • Line KNYS Uprate Project National Fuel Gas Supply Corp Expansion Completed 12/12/2019 • Line N to Monaca Project National Fuel Gas Supply Corp Lateral Completed 12/11/2019 • Marquette Branch Line Expansion Project Northwest Natural Gas Co Expansion Completed 11/10/2019 • Mountaineer XPress Pipeline (TCO Pool) Columbia Gas Transmission Expansion Completed 01/03/2019 • Mountaineer XPress Pipeline (to CGT) Columbia Gas Transmission Expansion Completed 01/03/2019 • Natural Bridge Pipeline Black Hills Gas Distribution LLC New Pipeline Completed 02/12/2019 • North Mist Expansion Project Northwest Natural Gas Co New Pipeline Completed 31/05/2019 • North Seattle Lateral Upgrade Project Northwest Pipeline Co Expansion Completed 14/11/2019 • North Texas Pipeline Expansion/Old Ocean Pipeline Enterprise, Energy Transfer Partners Expansion Completed 15/01/2019 • Northern Lights 2019 Northern Natural Gas Co New Pipeline Completed 18/10/2019 • ONEOK Eastbound Expansion ONEOK Inc. Expansion Completed 01/02/2019 • ONEOK Westbound Expansion ONEOK Inc. Expansion Completed 01/02/2019 • ONEOK WestTex Expansion ONEOK Inc. Expansion Completed 01/02/2019 • Portland Xpress Project Phase 2 Portland Natural Gas Transmission System Expansion Completed 21/02/2019 • Red Bluff Express Extension Energy Transfer Co Expansion Completed 31/08/2019 • Risberg Line RH energytrans LLC New Pipeline Completed 22/11/2019 • Rivervale South to Market Project Transcontinental Gas Pipeline Expansion Completed 03/09/2019 • Roadrunner Eastbound Project ONEOK Inc. Reversal Completed 01/02/2019 • Rochester Expansion Project Northern Natural Gas Co Lateral Completed 05/12/2019 • Sanford Project Florida Gas Trans Co Expansion Completed 01/08/2019 • Southside Connector Distribution Project Virginia Natural Gas New Pipeline Completed 01/03/2019 • Spire St. Louis Pipeline (Laclede Lateral) Spire STL Pipeline LLC New Pipeline Completed 14/11/2019 • St. James Supply Project Transcontinental Gas Pipeline Lateral Completed 02/04/2019 • Stratton Ridge Expansion Texas Eastern Transmission Expansion Completed 22/03/2019 • Texas-Louisiana Markets Project Texas Eastern Transmission Expansion Completed 31/05/2019 • Transwestern Lea County Expansion Transwestern Pipeline Co Expansion Completed 24/04/2019 • Valley Crossing Pipeline (Nueces - Brownsville) Enbridge Energy Pipeline Co New Pipeline Completed 07/02/2019 • Westbrook Xpress Project Phase 1 Portland Natural Gas Transmission System Expansion Completed 09/07/2019 • Westlake Expansion Project Gulf South Pipeline Lateral Completed 09/08/2019 • Alabama Compressor Station Upgrade AlaTenn Pipeline Expansion Completed 08/10/2020 • Buckeye Xpress Columbia Gas Transmission Expansion Completed 21/12/2020 • Cheniere MIDSHIP Pipeline Project Cheniere MIDSHIP Pipeline New Pipeline Completed 16/04/2020 • Cheyenne Connector Pipeline Tallgrass Energy Partners LP Expansion Completed 24/06/2020 • Cheyenne Hub Enhancement Project Rockies Express Pipeline Expansion Completed 24/06/2020 • DTE LEAP Project DTE New Pipeline Completed 01/08/2020 • East Louisiana Project Florida Gas Trans Co Expansion Completed 07/04/2020 • Empire North Expansion Project Empire Pipeline Expansion Completed 26/06/2020 • Gateway Expansion Project Transcontinental Gas Pipeline Expansion Completed 22/11/2019 • Hammerhead Pipeline Equitrans Midstream Corporation New Pipeline Completed 01/08/2020 • Hillabee Expansion phase 2 Transcontinental Gas Pipeline Expansion Completed 13/04/2020 • Index 99 Expansion Project Gulf South Pipeline New Pipeline Completed 25/08/2020 • Lakeshore Capacity Improvement Project (PCIP) Wisconsin Electric Gas Operations (WEGO) Lateral Completed 21/08/2020 • Leidy North Project Dominion Energy Transmission Co Expansion Completed 18/08/2020 • Line DT and DS Replacement Project Southern Star Central Gas Pipeline Upgrade Completed 23/11/2020 • Line OT-27 Project Enable Gas Transmission Lateral Completed 01/01/2020 • Lockridge Extension Pipeline Nat Gas P L Co of America Expansion Completed 28/09/2020 • New Lisbon 2020 Expansion Project Northern Natural Gas Co Expansion Completed 29/10/2020 • Northern Delaware Basin Expansion Project El Paso Natural Gas Expansion Completed 01/02/2020 • Portland Xpress Project Phase 3 Portland Natural Gas Transmission System Expansion Completed 28/10/2020 • Rover Expansion Project Rover Pipeline Expansion Completed 20/04/2020 • Sabal Trail Project Phase II Spectra Energy Corp/NextEra Energy/Duke Energy Expansion Completed 22/04/2020 • Sabine Pass Compression Project Nat Gas P L Co of America Expansion Completed 01/10/2020 • Saginaw Trail Pipeline Consumers Energy Co. New Pipeline Completed 23/11/2020 • Sendero Carlsbad Gateway Project Sendero Carlsbad Gateway LLC New Pipeline Completed 04/05/2020 • Sierrita Pima Expansion Sierrita Gas Pipeline Expansion Completed 31/03/2020 • South Mainline Expansion Project El Paso Natural Gas Expansion Completed 02/07/2020 • Tri-West Project Dominion Energy Transmission Co Expansion Completed 28/08/2020 • VNG Suffolk No. 3 Meter Station Expansion Project Columbia Gas Transmission Expansion Completed 06/10/2020 • Wamsutter West Expansion Dominion Energy Overthrust Pipeline Expansion Completed 01/11/2020 • Wick Meter Station Project Rover Pipeline Expansion Completed 15/07/2020 • Willis Lateral Project Gulf South Pipeline Lateral Completed 29/05/2020 • 134th Street Lateral Project Nat Gas P L Co of America Lateral Completed 20/08/2021 • 2021 Auburn A-line Abandonment and Capacity Replacement Project Northern Natural Gas Co Upgrade Completed 11/08/2021 • 261 Upgrade Projects Tennessee Gas Pipeline Co Expansion Completed 06/10/2021 • AGL International Paper Pipeline Atlanta Gas Light Lateral Completed 31/08/2021 • Agua Blanca Expansion Project WhiteWater Expansion Completed 27/01/2021 • Appalachia to Market Project Texas Eastern Transmission Conversion Completed 01/11/2021 • Atlantic Bridge Project Phase 2 Algonquin Gas Transmission Expansion Completed 25/01/2021 • Atlantic Bridge Project Phase 2 (CAN) Maritimes & Northeast Pipeline Expansion Completed 25/01/2021 • Bernville Compression Station Project Texas Eastern Transmission Upgrade Completed 03/11/2021 • Blue Water Energy Center (BWEC) Pipeline Vector Pipeline Lateral Completed 15/12/2021 • Bluewater Compressor Project Bluewater Gas Storage Expansion Completed 19/11/2021 • Cameron Extension Project Texas Eastern Transmission Expansion Completed 09/12/2021 • Carlsbad South Project El Paso Natural Gas Expansion Completed 28/02/2021 • CJ Express Pipeline Midcoast Energy New Pipeline Completed 30/03/2021 • Del-Mar Energy Pathway Project Eastern Shore Natural Gas Expansion Completed 22/09/2021 • Double E Pipeline Summit Midstream Partners New Pipeline Completed 17/11/2021 • FM 100 Project National Fuel Gas Supply Corp Expansion Completed 01/12/2021 • Galveston County Project Florida Gas Trans Co Lateral Completed 01/02/2021 • Gillis Lateral Enterprise Products Partners Lateral Completed 01/12/2021 • Lakeshore Lateral Project (LLP) Wisconsin Electric Gas Operations (WEGO) Lateral Completed 07/10/2021 • Lamar County Expansion Project Gulf South Pipeline Lateral Completed 15/12/2021 • Leidy South Project Transcontinental Gas Pipeline Expansion Completed 15/12/2021 • Line Section 22 Project WBI Energy Transmission Expansion Completed 31/08/2021 • Line SM-116 Forced Relocation Project TC Energy Upgrade Completed 26/08/2021 • Mainline 300 Replacement Project Columbia Gulf Transmission Upgrade Completed 29/07/2021 • MASS Project Enable Gas Transmission Expansion Completed 01/04/2021 • McComb Compressor Station Reliability Project Gulf South Pipeline Expansion Completed 01/03/2021 • Middlesex Expansion Project Texas Eastern Transmission Expansion Completed 28/09/2021 • NGPL Gulf Coast Southbound Project (Phase II) Nat Gas P L Co of America Reversal Completed 01/03/2021 • Permian Highway Pipeline Project Kinder Morgan Energy Partners New Pipeline Completed 01/01/2021 • Point of Rocks West Expansion Project Overthrust Pipeline Expansion Completed 31/12/2021 • Santa Fe Mainline New Mexico Gas Expansion Completed 26/02/2021 • Southeastern Trail Expansion Project Transcontinental Gas Pipeline Expansion Completed 01/03/2021 • Trail County Pipeline Dakota Natural Gas, LLC Expansion Completed 05/08/2021 • TransCameron Pipeline TransCameron Pipeline LLC/Venture Global Calcasieu Pass Lateral Completed 07/04/2021 • Tuscarora Xpress Project TC Energy Expansion Completed 08/11/2021 • Valentine Chemicals Interconnect Project Gulf South Pipeline Lateral Completed 06/07/2021 • West Loop Project Dominion Energy Transmission Co Expansion Completed 09/06/2021 • Westbrook Xpress Project Phase 2 Portland Natural Gas Transmission System Expansion Completed 21/10/2021 • Westbrook Xpress Project Phase 3 Portland Natural Gas Transmission System Expansion Completed 21/10/2021 • Whistler Pipeline Project WhiteWater New Pipeline Completed 01/07/2021 • Acadiana Project Kinder Morgan Energy Partners Expansion Completed 01/10/2022 • Bailey East Mine Panel 11J Project Texas Eastern Transmission Upgrade Completed 29/11/2022 • Central Corridor Pipeline Extension Duke Energy Ohio Expansion Completed 14/03/2022 • Grand Chenier XPress Project ANR Pipeline Expansion Completed 12/11/2021 • Greene Interconnect Project Mountain Valley Pipeline, LLC Expansion Completed 30/09/2022 • Gulf Run Pipeline Enable Gas Transmission New Pipeline Completed 14/12/2022 • Gulfstream Phase VI Expansion Project Gulfstream Natural Gas System LLC Expansion Completed 12/07/2022 • L-722 Replacement Project Columbia Gas Upgrade Completed 17/11/2022 • Louisiana XPress Project Columbia Gulf Transmission Expansion Completed 21/09/2022 • Lowman Pipeline NextEra Energy Lateral Completed 31/07/2022 • Marshall County Mine Panels 19E and 20E Projects Texas Eastern Transmission Upgrade Completed 26/10/2022 • Mobile County Project Florida Gas Trans Co Expansion Completed 31/01/2022 • Moore-Dorchester Optimization Project Carolina Gas Transmission Expansion Completed 30/09/2022 • Niles Power Plant Meter Station Project ANR Pipeline Lateral Completed 13/07/2022 • North Bakken Expansion Project MDU Resources Group New Pipeline Completed 26/01/2022 • Northern Lights 2021 Expansion Northern Natural Gas Co Expansion Completed 13/12/2022 • Putnam Expansion Project Florida Gas Trans Co Expansion Completed 25/02/2022 • Rover - North Coast Interconnect Project Rover Pipeline Lateral Completed 16/12/2022 • Rover–Brightmark Receipt and Delivery Meter Station Project Rover Pipeline Lateral Completed 02/10/2022 • Southwest Alabama Project Florida Gas Trans Co Expansion Completed 12/01/2022 • Wisconsin Access Project ANR Pipeline Expansion Completed 01/11/2022 • Yorktown Meter Station Upgrade Algonquin Gas Transmission Expansion Completed 10/03/2022