Difference between revisions of "Mardi Gras Offshore Oil and Gas Pipeline System"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
* It has an expected peak flow rate of 1.25 million barrels of oil per day and 1.5 billion standard cubic feet of gas per day by about 2012. | * It has an expected peak flow rate of 1.25 million barrels of oil per day and 1.5 billion standard cubic feet of gas per day by about 2012. | ||
* This project is made up of pipeline segments extending from deepwater fields (including the [[Thunder Horse Oil Field]] located in 6,000 feet of water as well as [[Na Kika Oil Field]], [[Mad Dog Oil Field]], [[Holstein Oil Field]], and [[Atlantis Oil Field]]) to shelf facilities and to shore. | * This project is made up of pipeline segments extending from deepwater fields (including the [[Thunder Horse Oil Field]] located in 6,000 feet of water as well as [[Na Kika Oil Field]], [[Mad Dog Oil Field]], [[Holstein Oil Field]], and [[Atlantis Oil Field]]) to shelf facilities and to shore. | ||
+ | * Crude from the [[Appomattox Oil Field]] is transported via Maddox pipeline which connects to the Proteus pipeline | ||
* It consists of the Proteus and Endymion oil pipeline systems and the Okeanos gas pipeline | * It consists of the Proteus and Endymion oil pipeline systems and the Okeanos gas pipeline | ||
* **Proteus** is a 28" diameter transportation system which has been designed to transport 420 thousand barrels per day | * **Proteus** is a 28" diameter transportation system which has been designed to transport 420 thousand barrels per day | ||
Line 23: | Line 24: | ||
=== History === | === History === | ||
* 2003 - Open season for Proteus Oil Pipeline | * 2003 - Open season for Proteus Oil Pipeline | ||
+ | * 2018 - The Maddox connection was completed | ||
=== Other Information === | === Other Information === |
Latest revision as of 06:57, 30 May 2023
Contents
Summary Information
- Source: Green Canyon and Mississippi Canyon
- Destination:
- Ownership: BP
- Website: http://www.bppipelines.com/
- Length: kilometres ( miles)
- Capacity: barrels of oil per day
- Crude Type:
Brief Description
- The Mardi Gras Transportation System serves the development of five deepwater fields in the southern Green Canyon and Mississippi Canyon Areas.
- It has an expected peak flow rate of 1.25 million barrels of oil per day and 1.5 billion standard cubic feet of gas per day by about 2012.
- This project is made up of pipeline segments extending from deepwater fields (including the Thunder Horse Oil Field located in 6,000 feet of water as well as Na Kika Oil Field, Mad Dog Oil Field, Holstein Oil Field, and Atlantis Oil Field) to shelf facilities and to shore.
- Crude from the Appomattox Oil Field is transported via Maddox pipeline which connects to the Proteus pipeline
- It consists of the Proteus and Endymion oil pipeline systems and the Okeanos gas pipeline
- **Proteus** is a 28" diameter transportation system which has been designed to transport 420 thousand barrels per day
- The **Okeanos gas pipeline** interconnects with the Destin Gas Pipeline at Main Pass 260
Pipeline Status
- In operation
History
- 2003 - Open season for Proteus Oil Pipeline
- 2018 - The Maddox connection was completed
Other Information
- -