Difference between revisions of "Kraken FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Name: Kraken FPSO * Field: [[[Kraken Oil Field]]] * Country: UK * Ownership: Bumi Armada * Website: http://www.bumiarmada.com/ * Field Operated...")
 
Line 2: Line 2:
  
 
* Name: Kraken FPSO
 
* Name: Kraken FPSO
* Field: [[[Kraken Oil Field]]]
+
* Field: [[Kraken Oil Field]]
 
* Country: UK
 
* Country: UK
 
* Ownership: Bumi Armada
 
* Ownership: Bumi Armada
Line 12: Line 12:
 
=== Brief Description ===
 
=== Brief Description ===
  
* The [[[Kraken FPSO]]] will have a storage capacity of 600,000 barrels
+
* The Kraken FPSO will have a storage capacity of 600,000 barrels
 
* The FPSO will be able to handle a peak fluid rate of 460,000 barrels per day (bpd) and 80,000 barrels of oil per day (bopd), 275,000 bpd of water injection, 20 million standard cubic feet (MMscf) of gas handling
 
* The FPSO will be able to handle a peak fluid rate of 460,000 barrels per day (bpd) and 80,000 barrels of oil per day (bopd), 275,000 bpd of water injection, 20 million standard cubic feet (MMscf) of gas handling
 
* Main dimensions of the vessel are 285.41 m in length overall and 50 m in breadth
 
* Main dimensions of the vessel are 285.41 m in length overall and 50 m in breadth

Revision as of 14:53, 4 February 2023

Summary Information

Brief Description

  • The Kraken FPSO will have a storage capacity of 600,000 barrels
  • The FPSO will be able to handle a peak fluid rate of 460,000 barrels per day (bpd) and 80,000 barrels of oil per day (bopd), 275,000 bpd of water injection, 20 million standard cubic feet (MMscf) of gas handling
  • Main dimensions of the vessel are 285.41 m in length overall and 50 m in breadth


Contractors

  • **Bumi Armada:** Supply of FPSO
  • Keppel: FSPO Conversion, including refurbishment and life extension works, upgrading of living quarters to accommodate 90 personnel, installation of an internal turret mooring system as well as the installation and integration of topside process modules
  • **Deltamarin:** basic design
  • **Wärtsilä:** EPC delivery of two identical power generation modules
  • **MacGregor:** Pusnes offloading system
  • **Frames:** Produced Water Treatment package (PWT)
  • **ABB:** Drives and systems for electrical distribution, integrated control, safety and power management

Status

  • Under construction

History

  • 2013 - LOI signed with Bumi Armada for FPSO
  • 2014 - Keppel awarded FPSO conversion contract

Other Information

  • -

Links

  1. Bumi Armada Secures Letter Of Interim Agreement For Its First North Sea FPSO Contract
  2. Bumi Armada Signs Kraken Contract Worth Usd 1.4 Billion / Rm 4.6 Billion
  3. Wärtsilä topside power modules chosen for North Sea FPSO
  4. Deltamarin designs FPSO unit for Bumi Armada
  5. Keppel secures contracts worth S$368 million
  6. MacGregor wins Pusnes offloading system order from Bumi Armada
  7. ABB wins power and automation order for vessel in British North Sea
  8. Successfully completed PWT package