Difference between revisions of "CP2 LNG Export Terminal Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 16: | Line 16: | ||
=== Technical Details ===  | === Technical Details ===  | ||
| − | * Storage capacity:  | + | * Storage capacity: 4x 200,000 m3 full containment LNG storage tanks  | 
* Constructor:  | * Constructor:  | ||
* Licensor:  | * Licensor:  | ||
Revision as of 14:42, 22 June 2022
Contents
Summary Information
- Ownership: Venture Global
 - Website: https://venturegloballng.com/
 - Location: Cameron Parish, Louisiana
 - Capacity: 20.0 million tons/annum
 - Status: Planned
 
Brief Description
- A liquefied natural gas (LNG) terminal with a nameplate liquefaction capacity of 20 million metric tonnes per annum (MTPA) of LNG and a peak capacity of approximately 24 MTPA. The project will be built in 2 phases
 - It will have 18 liquefaction blocks, each with a nameplate capacity of approximately 1.1 MTPA of LNG (9 blocks per phase)and Four 200,000 m3 full containment LNG storage tanks (two tanks per phase) and Two marine loading berths
 - There will be an on-site combined cycle gas turbine power plant with a nameplate capacity of 1,440 MW (~720 MW per phase)
 - The plant will effectively be a carbon copy of Venture Global’s Calcasieu Pass LNG and Plaquemines LNG facilities
 
- CP Express will build, own and operate a new 48-inch-diameter pipeline approximately 85.1 miles in length and a new 24-inch diameter lateral pipeline approximately 5.9 miles in length, connecting the CP2 LNG terminal to the existing natural gas pipeline grid in east Texas and southwest Louisiana.
 
Technical Details
- Storage capacity: 4x 200,000 m3 full containment LNG storage tanks
 - Constructor:
 - Licensor:
 
Ongoing Projects/Project Status
- Commissioning of phase one is expected in 2026
 
Suppliers / Customers
- Suppliers: The CP Express pipeline will provide natural gas to the CP2 LNG facility
 - Customers:
- EnBW - 0.75 mtpa
 
 
History
- 2021 - Venture Global announced the project
 - 2022 - EnBW signed a contract to buy 0.75 mtpa
 
Other Information
- -