Difference between revisions of "Chhara LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 41: | Line 41: | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [[Tractebel Engineering LNG References]] | ||
# [https://abarrelfull.blogspot.com/2022/01/toyo-awarded-lng-regasification-project.html TOYO Awarded LNG Regasification Project in India] | # [https://abarrelfull.blogspot.com/2022/01/toyo-awarded-lng-regasification-project.html TOYO Awarded LNG Regasification Project in India] | ||
# [https://abarrelfull.blogspot.com/2022/01/hpcl-acquires-balance-50-stake-in.html HPCL acquires balance 50% stake in Chhara LNG Terminal] | # [https://abarrelfull.blogspot.com/2022/01/hpcl-acquires-balance-50-stake-in.html HPCL acquires balance 50% stake in Chhara LNG Terminal] | ||
[[category:LNG]] | [[category:LNG]] | ||
− | [[category: | + | [[category:India]] |
Latest revision as of 11:00, 21 January 2022
Contents
Summary Information
- Ownership: HPCL LNG
- Website: https://www.hplng.in/
- Location: Chhara, Gujarat, India
- Capacity: 5.0 million tons/annum
- Status: Under construction
Brief Description
- An onshore regasification terminal with two large tanks
- The terminal is designed for potential expansion to 10 mtpa capacity
- The Project shall be operated on tolling business model wherein off-takers will book capacity in the terminal
Technical Details
- Storage capacity: 2 tanks of 200,000 m3 each
- Unloading capacity:
- Send out capacity:
- Constructor:
- Tractebel Engineering: Detailed feasibility study
- Toyo-India: EPC work on a turnkey basis, from engineering to construction and commissioning
- IHI Corporation & Afcons: Engineering and procurement of the entire LNG tank, mechanical construction of the tank and trial operation
Ongoing Projects/Project Status
- Under construction
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Customers: The customers will be gas traders who buy capacity and sell through the grid
History
- 2107 - Environmental clearance given for the project
- 2019 - Toyo-India awarded EPC contract
- 2021 - HPLC became 100% owner of the project
Other Information
-