(Created page with "Summary Information Ownership: IndianOil Website: http://www.iocl.com/ Location: Ennore, India Capacity: 5.0 million tons/annum Status: Under construction Brief Description A...")
 
Line 1: Line 1:
−
Summary Information
+
=== Summary Information ===
−
Ownership: IndianOil
+
 
−
Website: http://www.iocl.com/
+
* Ownership: IndianOil
−
Location: Ennore, India
+
* Website: http://www.iocl.com/
−
Capacity: 5.0 million tons/annum
+
* Location: Ennore, India  
−
Status: Under construction
+
* Capacity: 5.0 million tons/annum  
−
Brief Description
+
* Status: Under construction
−
A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future
+
 
−
Technical Details
+
+++ Brief Description
−
Storage capacity: 2 * 180,000m3 tanks
+
* A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future
−
Unloading capacity:
+
 
−
Send out capacity:
+
+++ Technical Details
−
Constructor:
+
* Storage capacity: 2 * 180,000m^^3^^ tanks
−
Tractebel: Consultancy services for the preparation of a detailed feasibility report
+
* Unloading capacity:  
−
MHI: Construction of LNG storage tanks
+
* Send out capacity:  
−
Ongoing Projects/Project Status
+
* Constructor:
−
Under construction
+
* **Tractebel:** Consultancy services for the preparation of a detailed feasibility report
−
IOCL have awarded the contract for front-end engineering and design (FEED) study to Foster Wheeler
+
* **MHI:** Construction of LNG storage tanks
−
Completion expected 2018
+
 
−
Suppliers / Customers
+
 
−
Suppliers:
+
+++ Ongoing Projects/Project Status
−
Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer
+
* Under construction
−
History
+
* IOCL have awarded the contract for front-end engineering and design (FEED) study to Foster Wheeler
−
2010 - IndianOil signs MoU with TIDCO
+
* Completion expected 2018
−
2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates
+
 
−
2015 - MHI awarded tank construction contract
+
+++ Suppliers / Customers
−
Other Information
+
* Suppliers:  
−
-
+
* Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer
−
Relevant Links
+
 
−
Tractebel Engineering LNG References
+
 
−
IndianOil signs MoU with TIDCO for Ennore LNG Project
+
+++ History
−
Indian Oil in talks with Dhamra port for LNG terminal
+
* 2010 - IndianOil signs MoU with TIDCO  
−
Foster Wheeler Awarded Contract for an LNG Receiving Terminal in India
+
* 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates
−
MHI Receives Order for 2 LNG Storage Tanks from IndianOil
+
* 2015 - MHI awarded tank construction contract
 +
 
 +
+++ Other Information
 +
* -
 +
 
 +
=== Links ===
 +
# [[Tractebel Engineering LNG References]]
 +
# [http://www.iocl.com/aboutus/NewsDetail.aspx?NewsID=9202&tID=8 IndianOil signs MoU with TIDCO for Ennore LNG Project]
 +
# [http://economictimes.indiatimes.com/news/news-by-industry/energy/oil-gas/indian-oil-in-talks-with-dhamra-port-for-lng-terminal/articleshow/11107829.cms Indian Oil in talks with Dhamra port for LNG terminal]
 +
# [http://killajoules.wikidot.com/blog:1941 Foster Wheeler Awarded Contract for an LNG Receiving Terminal in India]
 +
# [http://killajoules.wikidot.com/blog:5949 MHI Receives Order for 2 LNG Storage Tanks from IndianOil]

Revision as of 16:37, 17 January 2022

Summary Information

  • Ownership: IndianOil
  • Website: http://www.iocl.com/
  • Location: Ennore, India
  • Capacity: 5.0 million tons/annum
  • Status: Under construction

+++ Brief Description

  • A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future

+++ Technical Details

  • Storage capacity: 2 * 180,000m^^3^^ tanks
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
* **Tractebel:** Consultancy services for the preparation of a detailed feasibility report
* **MHI:** Construction of LNG storage tanks


+++ Ongoing Projects/Project Status

  • Under construction
  • IOCL have awarded the contract for front-end engineering and design (FEED) study to Foster Wheeler
  • Completion expected 2018

+++ Suppliers / Customers

  • Suppliers:
  • Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer


+++ History

  • 2010 - IndianOil signs MoU with TIDCO
  • 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates
  • 2015 - MHI awarded tank construction contract

+++ Other Information

  • -

Links

  1. Tractebel Engineering LNG References
  2. IndianOil signs MoU with TIDCO for Ennore LNG Project
  3. Indian Oil in talks with Dhamra port for LNG terminal
  4. Foster Wheeler Awarded Contract for an LNG Receiving Terminal in India
  5. MHI Receives Order for 2 LNG Storage Tanks from IndianOil