Difference between revisions of "Cameron LNG Export Terminal Project"
		
		
		
		
		Jump to navigation
		Jump to search
		
Abarrelfull (talk | contribs)  | 
				Abarrelfull (talk | contribs)   | 
				||
| Line 29: | Line 29: | ||
=== Suppliers / Customers ===  | === Suppliers / Customers ===  | ||
| − | * Suppliers: The Cameron Interstate Pipeline connects the terminal to [[Trunkline Gas Company Pipeline]], [[Transcontinental Gas Pipe Line (Transco)]],    | + | * Suppliers: The Cameron Interstate Pipeline connects the terminal to [[Trunkline Gas Company Pipeline]], [[Transcontinental Gas Pipe Line (Transco)]], [[Texas Eastern Transmission Gas Pipeline]] and the [[Tennessee Gas Pipeline]]  | 
* Customers:  | * Customers:  | ||
** GDF SUEZ will buy 4 million tons per annum (MTPA)  | ** GDF SUEZ will buy 4 million tons per annum (MTPA)  | ||
Revision as of 16:38, 13 January 2022
Contents
Summary Information
- Ownership: Sempra
 - Website: https://cameronlng.com/
 - Cameron LNG’s partners are Sempra Infrastructure, Mitsui & Co., Mitsubishi Corporation, TotalEnergies, and NYK Line
 - Location: On the Calcasieu Channel, 18 miles from the Gulf of Mexico in Hackberry, Louisiana
 - Capacity: 12.0 million tons/annum
 - Status: In operation
 
Brief Description
- A conversion of the existing Cameron LNG Terminal into a large liquifaction terminal
 - The project added three separate systems that liquefy natural gas; one 160,000-cubic-meter, full-containment LNG storage tank; refrigerant make-up and condensate product storage; a truck loading/unloading area; one marine work dock; minor modifications to existing terminal facilities; 21 miles of 42-inch-diameter pipeline; one 56,820-horsepower compressor station; and ancillary facilities.
 
Technical Details
- Storage capacity: Four full-containment storage tanks (4 x 160,000 cubic meters) (One additional tank)
 - Constructor:
- Foster Wheeler: Owner's Engineer Contract
 - Tractebel: review of FEED LNG liquefaction/process package
 - CB&I and Chiyoda: Engineering, procurement and construction for the addition of natural gas liquefaction and export facilities
 
 - Licence: Air Products
 
Ongoing Projects/Project Status
- The terminal was commissioned in 2019
 - In 2016, Cameron LNG received all the regulatory approvals needed to expand the base 3-Train project. The Expansion Project, if undertaken, would include two additional liquefaction Trains (Trains No. 4 and No. 5) and up to two additional full containment LNG storage tanks.
 
Suppliers / Customers
- Suppliers: The Cameron Interstate Pipeline connects the terminal to Trunkline Gas Company Pipeline, Transcontinental Gas Pipe Line (Transco), Texas Eastern Transmission Gas Pipeline and the Tennessee Gas Pipeline
 - Customers:
- GDF SUEZ will buy 4 million tons per annum (MTPA)
 - TEPCO will buy 800,000 tons per annum (MTPA)
 - Toho Gas will buy 300,000 tons per annum
 - CPC of Taiwan will buy 0.8 million tons per annum
 
 
History
- 2012 - Foster Wheeler Wins Owner's Engineer Contract
 - 2012 - GDF-Suez signs purchase agreement
 - 2013 - Tepco signs a purchase contract
 - 2013 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreement
 - 2014 - Draft environmental impact statement released
 - 2014 - Export permits granted
 - 2014 - EPC contract awarded
 - 2014 - FERC issues Final Environmental Impact Statement
 - 2014 - FID made
 - 2014 - Construction started
 - 2018 - Total becomes a shareholder
 - 2019 - Train 1 begins operations
 - 2020 - Train 3 begins operations
 
Other Information
-
Links
- Tractebel Engineering LNG References
 - Foster Wheeler Wins Owner's Engineer Contract for LNG Liquefaction Facility in Louisiana
 - GDF SUEZ signs an agreement with Sempra Energyto access natural gas liquefaction capacity in the United States
 - Purchase of Lean LNG from the U.S. Cameron Project Basic Agreement on the First Project to Secure 10 Million Lean LNG Annually
 - Sempra Energy, GDF SUEZ, Mitsubishi, Mitsui Sign Tolling Capacity, Joint-Venture Agreements For Louisiana Liquefaction Export Facility
 - GDF SUEZ to become a U.S. LNG exporter, with the Cameron LNG project
 - DEIS on Cameron LNG, LLC’s and Cameron Interstate Pipeline, LLC’s Liquefaction Project
 - Toho Gas in agreement with the U.S. Cameron Project for LNG purchase
 - Sempra Energy Subsidiary Receives U.S. Department of Energy LNG Export License For Louisiana Liquefaction Facility
 - CB&I and Chiyoda Awarded Contract for LNG Liquefaction and Export Facilities
 - First GDF SUEZ long term LNG sale to Asia with a 0.8 mtpa contract to CPC of Taiwan
 - FERC issues Final Environmental Impact Statement on Cameron LNG
 - First GDF SUEZ long term LNG sales to Japan
 - GDF SUEZ and its partners take Final Investment Decision for the Cameron LNG project
 - Cameron LNG Liquefaction Project Breaks Ground In Louisiana
 - Air Products Wins LNG Technology and Equipment Order for Louisiana Terminal Facility
 - Total Closes the acquisition of Engie’s Upstream LNG Business And Becomes World #2 LNG Player
 - Cameron LNG’s Train 1 Begins Commercial Operations
 - Cameron LNG Train 3 Begins Commercial Operation